16
INSTALLATION
Ventilation
A minimum building ventilation rate of 4 CFM per 1,000 BTU of installed heater input must
be provided. This rate of ventilation may be obtained through either gravity or mechanical
ventilation of the building. In conjunction with building ventilation system, adequate fresh
air into the building must be provided through fresh air inlets and/or building inlets. It is
recommended local code be checked to assure the ventilation system and heat installation
are in compliance with local and/or state codes.
Note: Gas connections on the heater are leak tested at the factory prior to shipment.
WARNING!
z
When checking for gas leaks, do not use an open flame. Use a soap and water solution.
z
Periodically check the whole gas system for leaks or immediately check if the smell of
gas is detected. Extinguish all open flames.
z
Never leak test while smoking.
z
Do not use heater until all connections have been leak tested and do not leak.
z
When leak testing, refer to the connections diagrams.
z
Only those parts recommended by the manufacturer should be used.
z
Substitution can void warranty.
Leak test
1
Make a soap solution of one part liquid detergent, and one part water. The soap solution
can be applied with a spray bottle, brush or rag. Soap bubbles will appear where a
leak is present.
2
Turn the gas supply “ON” check for leaks at leak points. If a leak is present, turn off
supply, tighten any leaking fittings, turn gas on and recheck.
Note: There is a manual shut-off lever on the internal heater control valve/regulator. This
lever is shipped in the “ON” position.
ON
OFF