5
WARNING
Keep fingers clear of pivoting
parts during assembly.
Step 5.
Install completed
Footplate/Seat Rail assem-
bly onto the Main Frame as
shown, using M10x180mm
bolt, M10 Nylock Nut and
2xM10 washers.
Insert the 180mm Footplate
Bolt with a standard M10
washer through the Mainframe, Footplate and Seat
Rail as shown left.
Secure with M10 Nylock Nut, and standard M10
Washer.
Note: For ease of assembly, keep the rower in this
position (with seat rail over the tank) for Steps 6-8.
5
M10x180mm
Seat rail bolt
and M10 washer
M10 Nylock
nut and M10
Washer
Seat Rail
Hold Seat Rail/
Footplate
assembly here
Once the Lower Frame is securely attached, con-
tinue steps 4-9 of the assembly from this position.
Seat Rail
Footplate
4
M10x100mm bolt,
Plastic Dome Cap,
and Vertical Seat Rail
Support bracket
4a
Footplate
Check alignment here
Step 4:
Insert the Seat Rail
into the Footplate until the
front of the Seat Rail just
protrudes slightly as shown.
Check alignment before in-
stalling Vertical Seat Rail
Bolt assembly.
Seat Rail
Top View
M10x 100mm Bolt
Plastic Dome
Cap
Vertical Seat
Rail Support
Bracket
Next, attach the Seat Rail onto the Footplate using
the M10x100mm bolt, Plastic Dome Cap, and Verti-
cal Seat Rail Support Bracket as shown.
4b
Position Vertical Seat
Rail Support Bracket
with bolt hole to rear
Summary of Contents for E-216 Fluid Rower
Page 1: ...Owners Manual ...