FIREPOWER FP 125,135,165
Manual 0-5123 4-9 OPERATION
4.13 Firepower FP 125 Welding Setting Selection Guide
Art # A-09030_AB
Steel
Flux Core
E71T-GS
None
Required
.030" (0.8mm)
.035" (0.9mm)
Steel
ER70S-6
Solid
(or hard)
100% CO
2
25cfh
.023" (0.6mm)
.030" (0.8mm)
.035" (0.9mm)
.023" (0.6mm)
.030" (0.8mm)
.035" (0.9mm)
75% Ar
25cfh
CO
2
25%
L1
L1
L1
5
L1
3.5
L1
3.5
5
3.5
L1
L1
L1
5
6
6
7.5
5
4
8
5
6
4.5
3
7
4
4
4
7
4
3
5
3.5
L2
L2
H1
H1
H1
H1
H1
H1
8
6
5
8.5
7.5
6.5
H2
H2
H2
H2
H2
H2
6
7.5
6.5
H2
H2
H2
H1
L2
L2
L1
L1
L2
3
L2
L2
L1
L1
5
6
4
L1
3
L1
7.5
6
4
3
H1
6.5
H2
L1
L1
L2
L2
H2
H2
8.5
7.5
H2
24 ga. (0.6mm) 22 ga. (0.7mm) 20 ga. (0.9mm) 18 ga. (1.2mm) 16 ga. (3mm) 1/8" (3.2mm) 3/16" (4.8mm)
Wire
Speed
Voltage
Step
THICKNESS
FINE
1
2
COARSE
LOW
HIGH
Material Type
Wire Type
Shielding Gas
and Flow Rate
Wire Size
(Diameter)
Figure 4-12: FP 125 Selection Guide
Summary of Contents for FP 95 FC
Page 26: ...FIREPOWER FP 125 135 165 INSTALLATION 3 10 Manual 0 5123 This Page Intentionally Blank...
Page 42: ...ESAB FIREPOWER FP 125 135 165 SERVICE 5 4 Manual 0 5123 This Page Intentionally Blank...
Page 49: ...FIREPOWER FP 125 135 165 Manual 0 5123 A 7 APPENDIX This Page Intentiolnally Blank...
Page 51: ......