64
Optional Equipment
(for qualified installers only)
© Travis Industries
4/23/2021 - 1552
564 GSR2 35K CF
5 Secure the manifold to the upper framing using screws (not included).
6 Re-attach the two rear mounting brackets (removed in step 6) to the bottom of the convection
manifold. Leave the screws loose so the brackets can be positioned to the back of the chase.
Secure the brackets to the chase using screws (not included). Tighten the screws securing the
brackets to the manifold.
7 Remove the knockouts from the top of the fireplace. Use snips or diagonal cutters to snip the tab
on the knockouts. Press on the far side away from the tap to pop the edge of the knockout
upward.
Secure to framing