Finalizing the Installation
(for qualified installers only)
© Travis Industries
4/23/2021 - 1552
564 GSR2 35K CF
Steps for Finalizing the Installation
1. Remove the glass (see page 38).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs.
2. We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected
once it enters the firebox, ensuring gas does not build up.
3. Install the four AA batteries (see illustration below). The AA batteries act as a power backup in case the
household (AC) power goes out and are required for operation. Install three AAA batteries into the remote (see
illustration below). Synchronize the transmitter to the IFC.
4. Install the firebacks (if applicable -see page 55).
NOTE
: If using glass firebacks or no firebacks, make sure the media tray covers are in place (see below)
5. Install the ember chunks and ember bed glass (see page 41)
6. Install the logs (see page 43).
7. Replace the glass.
8. Start the heater.
9. Leak test all gas joints.