
Installation
(for qualified installers only)
13
© Travis Industries
8/24/2017 - 1450
42 Apex CF
Convection Air Manifold
The convection air manifold is assembled on site and attached to the top of the fireplace. It directs
the hot convection air out of the fireplace and into the room.
42 Apex CF
Fireplace
Min. 3-1/2"
Lower Framing (included)
Upper Convection Manifold
6-1/2" *
Max. 116-1/2"
Min. 78-1/2" **
Lower Convection Manifold
5" Alum. Flex Duct (included)
Framing Header
Celing
Convection Air Outlet
Upper Framing (included)
*
When using the included upper framing members the manifold outlet will be 6-1/2” below the header.
This is the most common installation, placing the outlet at the tallest position. If you wish to make this
dimension lower, you may supply longer pieces of non-combustible framing to place the outlet in a
lower position.
** When the header is placed between 116-1/2” and 92-1/2” above the base of the fireplace, the
supplied lower framing members are installed without modification. If you wish to place the header
between 92-1/2” and 78-1/2”, the lower framing members will need to be cut down in length (use
hack saw, nail-clippers, etc.).