P
AGE
26
F
INALIZING THE
I
NSTALLATION
(C
ONT
.)
- For Qualified Installers Only!
!
We recommend you purge the gas line at this time (with the glass removed). This allows gas to be
detected once it enters the firebox, ensuring gas does not build up.
3
Replace the glass (follow the directions under "Glass Installation and Removal" on page 24).
4
Install the faceplate.
Rectangular Faces
Adjust he arch cover
(see page 12). Use the
outside attachments on
the side. There is not
center attachment for
rectangular faces.
Arch Faces
Use the inside
attachments on the
side and the
attachment at the
center of the face.
Phillips
Screwdriver
5
Turn on the gas to the fireplace. Turn on gas to the heater. Leak test all gas joints prior to starting
the appliance. Start the pilot. Start the main burner. Leak test all gas joints again.
6
Check the pilot flame to make sure it looks like the illustration below. Adjust the pilot flame if
necessary.
The pilot flame should impinge the top 3/8Ó (10
mm) of the thermopile. If it does not, you may
need to turn the pilot up.
To adjust the pilot flame, remove the cover screw (and
gasket) and turn the needle valve. Clockwise lowers
the flame while counter-clockwise raises it.
PILOT ADJ
T
O
L
PI
ON
OFF
Standard
Screwdriver
Micro (1/16Ó)
Standard
Screwdriver
AA
The cover screw and
gasket must be
replaced to prevent gas
from leaking
Cover Screw
Cover Screw Gasket
Needle Valve
3/8Ó (10 mm)
Thermopile
Pilot Hood
Thermocouple