background image

I

NSTALLATION 

(C

ONTINUED

)

P

AGE 

13

Chimney Requirements

Use one of the following brands and type of chimney:
• Temco 82          • Superior TF8          • FMI 8DM          • Marco 8D

Chimneys Part Numbers

C h i m n e y
C o m p o n e n t s

Temco 82

S u p e r i o r

T F 8

FMI 8DM

M a r c o

8 D

12" Chimney Section

8212D

TF8-12

12-8DM

12 - 8D

18" Chimney Section

8218D

TF8-18

18-8DM

18 - 8D

24" Chimney Section

8224D

---

24-8DM

----

36" Chimney Section

8236D

TF8-36

36-8DM

36 - 8D

48" Chimney Section

8248D

TF8-48

48-8DM

48 - 8D

Offsets

8232E

TF8-30, TF8-E30

30E-8DM

30E - 8D

Flashing

8206F

8-F6

6F8 or 12F8

12F - 8D

Chimney Cap

8203D

TF8-CTO

RTL-8HT

BT - 8D

Roof Support

8204S

8-54

38 RS

12CPS - 8D

Firestop Spacer

---

8FS-2

FS-8DM

FS30 - 8D

Chimney Connection to Fireplace

Each brand of chimney has a slightly different outside diameter.  To accommodate this, the fireplace
has three "L" brackets (outer liner connectors) on the top of the fireplace can.  Center a section of
chimney over the chimney opening and mark the exterior location of the chimney.  Then reposition
the "L" brackets, if necessary, so they are directly adjacent the exterior of the chimney.  Use a drill
with a 5/16" driver bit to re-install the "L" brackets (use the existing sheet metal screws).

Outer Pipe Brackets

Use sheet metal screws to attach 
the outer liner to these brackets.

Inner Liner (ledge along 
inside accepts differed 
sized chimney pipes)

If the outer pipe does not line up 
with the brackets, remove the 
brackets and re-attach them to 
the top of the fireplace.

Connect the inner pipe to 
the inner liner with three 
sheet metal screws.

When attaching the chimney to the fireplace, first slide down the inner liner of the chimney pipe into
the inner liner of the fireplace.  Certain brands of chimney pipe will stop at the ledge, while others
will insert beyond the ledge.  When the chimney pipe is fully seated and aligned, drill three holes in
the chimney pipe where it lines up with the holes in the fireplace inner liner.  Secure the fireplace to
the chimney pipe with three sheet metal screws.  If there are any large gaps between the chimney
pipe and fireplace, use furnace cement to seal (allow 24 hours to dry before burning the fireplace).

Summary of Contents for 36 ELITE-ZC

Page 1: ...A AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA Zero Clearance Fireplace Listed Tested to U L 127 and portions of U L 1482 907 36 ELITE ZC INSTALLATIO...

Page 2: ...nts 7 Cooling Vents 8 Blower 9 Blower Duct Connection 9 Blower Electrical Connection 10 Chimney 11 Chimneys Part Numbers 11 Chimney Connection to Fireplace 11 Chimney Height 12 Special Chimney Require...

Page 3: ...ns Heating Specifications Approximate Heating Capacity in square feet 1 200 2 500 Will vary with the home s Maximum Burning Time Up to 10 Hours floor plan insulation and BTU Output per Hour Cord Wood...

Page 4: ...ber Strip Log Retainer includes allen wrench instructions Flex Duct w start collar 3 Length 6 Dia For Blower Two 10 Flex Ducts 6 Diameter For Cooling Vents Two Vent Hoods For Cooling Vents Two Vent Ho...

Page 5: ...space the fireplace away from framing members or walls These stand offs may contact the framing members or walls but do not place insulation or other material in the space between the stand offs and f...

Page 6: ...ible floor EMBER STRIP INSTRUCTIONS Clearances When installed walls in front of the fireplace must be a minimum 18 to the side of the faceplate or 15 1 2 from the side of the fireplace see the illustr...

Page 7: ...brick river rock etc use the face being installed to create a template The fireplace is shipped with a set up face that is 1 16 larger on the top bottom and each side than the faceplate Leave the set...

Page 8: ...e fireplace recess the framing directly next to the fireplace See the illustration below 1 2 Drywall AAAA AAA1 2 Concrete Board 3 8 Tile Fireplace Overlapped Facing Framing 1 2 Drywall AAA AAAA 1 2 Co...

Page 9: ...m 18 Hearth must extend a minimum 8 to both sides of the faceplate 52 wide Hearth must be a minimum 1 thick of cement board or equivalent Hearth must not rise more than 6 1 2 above the base of the fir...

Page 10: ...are two 12 lengths of vent use a connector and seal if adding more length The duct terminations must be located so they can not be blocked e g snow drifts Included with the fireplace is a set of stor...

Page 11: ...uilding codes NOTE certain codes require a fire curtain in these cases Blower Duct Connection The blower may be placed in a ventilated crawl space if approved by the local building department AAAAAAAA...

Page 12: ...ace AAA AAA Blower Conduit Snap this piece into the top of the blower housing White Common Junction Box Exposed Ground Black Hot Screw this piece into the junction box Use wire nuts or other approved...

Page 13: ...en reposition the L brackets if necessary so they are directly adjacent the exterior of the chimney Use a drill with a 5 16 driver bit to re install the L brackets use the existing sheet metal screws...

Page 14: ...ly enclosed when passing through living space with a minimum 2 clearance to combustibles 3 Min 2 Min 10 System Height 35 Max 15 Min 2 Min Air Space to Combustibles Rain Cap Storm Collar Flashing Fires...

Page 15: ...back wall 4 1 2 minimum on the front wall and header and 18 minimum to the side walls The table below details the amount of offset X and rise R gained from various chimney lengths when used with 30 e...

Page 16: ...an 81 above the base of the fireplace If the fireplace is raised the enclosure height must be raised to maintain the 81 Do not build into this area Do not slope the walls inward The header vertical fr...

Page 17: ...4 16 1 2 x 24 3 4 10 12 16 x 23 3 4 16 x 25 1 2 16 1 2 x 24 1 4 16 1 2 x 26 11 12 16 x 25 16 x 26 3 4 16 1 2 x 25 1 2 16 1 2 x 27 1 4 12 12 16 x 26 1 8 16 x 28 1 8 16 1 2 x 26 5 8 16 1 2 x 28 5 8 Chi...

Page 18: ...er included with the faceplate Use a phillips screwdriver to remove the 10 screws holding the set up face in place Phillips Screwdriver 2 Make sure the firebrick is properly in place 3 Install the log...

Page 19: ...rebox 6 If installing a catalyst temperature meter do so now see the instructions included with the temperature meter 7 The faceplate is packaged with the faceplate attachment screws Use a phillips sc...

Page 20: ...CIRCUIT IS ACTIVE Make sure the door is closed Attach the two male quick connects from the switch plate to the two female quick connects leading from the fireplace These male quick connects are for th...

Page 21: ...his picture are out of alignment AA AA AA AA AA A AA AA A A A A Door Hinge pin Add washers to the hinge pins to make the doors align horizontally a b 11 Adjust the door latch if necessary to make a sn...

Page 22: ...LISTING INFORMATION PAGE 22 The listing label is shown below It can be found on the base of the fireplace behind the faceplate...

Page 23: ...LISTING INFORMATION PAGE 23...

Page 24: ...lation 19 Facing Requirements 5 Features 1 Finalizing the Installation 16 Firebrick Placement 16 Fireplace Placement Requirements 3 Firestops 14 FMI Chimney 11 Framing Dimensions 3 Grate Placement 16...

Reviews: