1
FGi.FPi.FXi
Issue
12 10/17
PLEASE READ ALL THESE INSTRUCTIONS CAREFULLY!
For safety reasons it is essential that your stove is correctly installed and operated. Charlton &
Jenrick cannot accept responsibility for any fault or consequential problems arising through
incorrect installation or operation.
TABLE OF CONTENTS
Section
Page No
1. List of Components
2
2. Component Identification and Assembly
2
3. Installation Instructions
3
3.1 Warnings and important safety information
3
3.2 Health & Safety Precautions
4
4 Installation Information
4
4.1 Chimney
4
4.2 Ventilation
5
4.3 Flue Draught
5
4.4 Connection to Chimney
5
4.5 Fixing
5
4.6 Material Clearances (combustible and non combustible)
6
4.7 Hearths
7
4.8 Commissioning & Handover
7
5. Technical Data – Declaration of Performance (DoP)
8
6. Operating Instructions
9
6.1 Safety Notes for your Guidance
9
6.2 Clean Air Act
10
6.3 Air controls
11
6.4 Multifuel Grate
12
6.5 Ashpan
12
6.6 Cleaning
12
6.7 Fuels
13
6.8 Important Information for Wood Burning
13
6.9 Notes for smokeless fuel burning.
14
6.10 Lighting the stove
15
6.11 Re-fuelling
16
6.12 Shutting down
16
6.13 Shutting down for prolonged periods
16
6.14 Maintenance
17
7. Maintenance
18
8. Dimensions
20
8.1 FGi/FXi/FPi 5 Dimensions
20
8.2 FGi/FXi/FPi 5W Dimensions
21
8.3 FGi/FXi/FPi 8 Dimensions
22
9. Frequently Asked Questions
23