Firebird
Installation & Operation Manual
8
3. Transportation and Handling
4. Before Operation
When hanging the unit, ensure a balance of the unit, check
safety and lift it up smoothly.
Do not remove any packing materials.
Hang the unit under packing condition with two ropes.
For safety reasons ensure that the outdoor unit is lifted smoothly
and does not lean.
CAUTION
• Supply electrical power to the system for approximately
12 hours before start-up or a long shut-off. Do not start
the system immediately after power supply, it may cause
a compressor failure because the compressor is not
heated well.
• When the system is started after a shut-off longer that
approximately 3 months, it is recommended to check the
system by your service contractor.
Enviroair 7.5kW
Enviroair 11 – 16kW
• Turn OFF the main switch when the system is to be stopped
for a long period of time: If the main switch is not turned
OFF, electricity will be used, because the oil heater is always
energised during compressor stopping.
• Make sure that the outdoor unit is not covered with snow or
ice. If covered, remove it by using hot water (approximately
50°C). If the water temperature is higher that 50 °C, it will
cause damage to plastic parts.
Accessory
Image
Qty.
Purpose
Gasket
4
Two gaskets for each
space heating connections
(inlet / outlet)
Instruction
manual
1
Declaration of
conformity
–
1
Basic instructions for the
installation of the device
NOTE
• The previous accessories are supplied inside the unit.
• If some of these accessories are not packed with the
unit or any damage to the unit is detected, please
contact your dealer.
4.1 Factory-Supplied Unit Components
Summary of Contents for Enviroair 11kW
Page 1: ...SUPERIOR HEATING SOLUTIONS SINCE 1980 Installation Operation Manual...
Page 2: ...Firebird Installation Operation Manual 2...
Page 9: ...9 5 General Dimensions Enviroair 11 16kW Enviroair 7 5kW 5 1 Service Space...
Page 54: ...Firebird Installation Operation Manual 54 Notes...
Page 55: ...55...