13
Around sides are open
Around sides are open with obstacles above
(Unit: mm)
No.
Description
1
Drain water
2
Drain water place
3
Concrete base
4
Foundation bolt
5
Mortar charge
The whole of the base of the Enviroair unit should be installed on
a foundation. When using a vibration-proof mat, it should also be
positioned the same way. When installing the Enviroair unit on a
field supplied frame, use metal plates to adjust the frame width
for stable installation as shown in below figure.
Recommended metal plate size
• (Field-supplied) material: hot-rolled mild steel
• Plate (SPHC) plate thickness: 4.5 T
6.2 Place Provision
Concrete foundation
• Foundation shall be on a level surface and it is recommended
to be 100-300 mm higher than ground level.
• Use M10 anchor bolts to fix the unit to the foundation.
(Foundation bolts, nuts and washers are not included,
and must be field supplied).
• Drain water might turn into ice on cold weather areas.
Therefore, when installing the unit on a roof or a
veranda, avoid the draining on a public area since it
may become slippery.
Summary of Contents for Enviroair 11kW
Page 1: ...SUPERIOR HEATING SOLUTIONS SINCE 1980 Installation Operation Manual...
Page 2: ...Firebird Installation Operation Manual 2...
Page 9: ...9 5 General Dimensions Enviroair 11 16kW Enviroair 7 5kW 5 1 Service Space...
Page 54: ...Firebird Installation Operation Manual 54 Notes...
Page 55: ...55...