10
Operating Instructions
Æ
Quick brewer setup NOTES
Install plumbing and electrical utilities.
-See Installation Section in this guide
Turn rear power switch “ON”.
-Located on back, lower right side
Brewer hot water tank will fill in 4-8 minutes.
-Ready screen will display ”
▪
FILLING”
Heater(s) activate when tank is full
-Ready screen will display ”
▪
HEATING”
Initial heating will be 15-30 minutes
Tank displays “
▪
READY” when filled & 200°F/93°C is reached
-Place dispenser under brewbasket(s)
to collect any overflow and condensate
Brewer is ready to brew when “
▪
READY” is displayed
-Best results if brewer remains “ON”
Brewing
Æ
To brew a single 3 liter coffee batch, using default recipe NOTES
FETCO CBS-2130 series equipment is factory calibrated and preloaded with recipes and is ready to brew.
Place 13”X5” paper filter in brew basket
-FETCO Product # F002 or any 13”X5”
Add 3-8 ounces (85 – 227 g) of ground coffee
-Weights given are only suggested
Insert loaded brewbasket into brewer rails
-Brewbasket(s) must be in place
Have empty dispenser under brewbasket
-Use the convenient locator guide
Tap “
▪
READY” screen to enter the batch selection menu
-A long duration “TAP” with fingertip
Touch a top batch key for “REGULAR 1”
-Touch batch pennant with fingertip
Brewer will brew and display the icon for the function step it is in
-Icon may be toggled for information
On dual side brewer, touch other side to access batches for brewing
-Right to left side switching by touch
Batch will complete brewing in 5 ½ minutes
-Brew time: 4 1½ min. drip out
(CBS-2131)
(CBS-2132)
Touch the “Ready” screen
anywhere briefly to activate
CBS-2132 selection
for brewing on right,
left or both sides.
Touch batch pennant
to access menu
Touch and hold finger on
selection pennant for about two
seconds to start brew