3. Installation
3-8
Festo SEC-ST-48-6-P01-EN en 0111NH
Please note
S
Make sure that the cables are provided with strain relief.
In the case of boom arm and multi-axis operation, cables
which are subject to mechanical stress must be laid in a
drag chain.
3.3.1 Overview of connections
Fig. 3/6: Complete structure of SEC-ST with motor and
controller
Summary of Contents for SEC-ST-48-6-P01
Page 2: ......
Page 4: ...Contents and general instructions II Festo SEC ST 48 6 P01 EN en 0111NH...
Page 13: ...System summary 1 1 Festo SEC ST 48 6 P01 EN en 0111NH Chapter 1...
Page 26: ...Fitting 2 1 Festo SEC ST 48 6 P01 EN en 0111NH Chapter 2...
Page 32: ...Installation 3 1 Festo SEC ST 48 6 P01 EN en 0111NH Chapter 3...
Page 44: ...Commissioning 4 1 Festo SEC ST 48 6 P01 EN en 0111NH Chapter 4...
Page 48: ...Diagnosis and error treatment 5 1 Festo SEC ST 48 6 P01 EN en 0111NH Chapter 5...
Page 52: ...Technical appendix A 1 Festo SEC ST 48 6 P01 EN en 0111NH Appendix A...