
5
Installation
38
Festo – EXCM-40-EN – 2017-11a – English
Earthing the X-axis
Connect the earthing cable
6
(not included in the scope of delivery) to the earthing component
2
on
the underside of the X-axis
1
.
1. Place the cable lug of the earthing cable between the large washer
7
and the serrated washer
5
.
2. Attach small washer
4
.
3. Tighten the hex nut
3
(tightening torque 4 Nm).
4. Connect the open end of the earthing cable to the central earthing point (e.g. in the control cabinet).
1
2
3
4
5
6
7
Fig. 5.3
5.3
Pneumatic installation
Description of the pneumatic interfaces:
è