2.2 Preparing the RIO network
2.2.1 Compiling the configuration list
Configuration of the CP system requires an accurate
procedure, as different configuration specifications are
sometimes necessary for each system due to the
modular structure. Before commissioning or programm-
ing you should therefore compile a configuration list of
all connected field bus slaves. Some A-B controllers
perform an automatic comparison between the NOMI-
NAL and ACTUAL configurations when they are
switched on. For the configuration it is important that:
Configuration
list
•
the specifications on configuration are as correct and
as complete as possible
•
the power supply to the PLC and to the RIO slaves
is switched on at the same time or in the sequence
specified (see Chapter 2.3).
2. Commissioning
2-4
CP FB8 9809a
Summary of Contents for Compact Performance Series
Page 2: ......
Page 12: ...Contents and general safety instructions X CP FB8 9809a...
Page 13: ...Chapter 1 Installation 1 Installation CP FB8 E 9809a 1 1...
Page 28: ...1 Installation 1 16 CP FB8 E 9809a...
Page 29: ...Chapter 2 Commissioning 2 Commissioning CP FB8 9809a 2 1...
Page 43: ...Chapter 3 Diagnosis 3 Diagnosis CP FB8 9809a 3 1...
Page 51: ...Appendix A Technical appendix A Technical appendix CP FB8 9809a A 1...