2.1 Preparing the CP system for operation on the
RIO network
2.1.1 Operating voltage
PLEASE NOTE
•
The CP field bus node must have a separate
operating voltage supply.
2.1.2 Saving the line assignment
PLEASE NOTE
Before commissioning the CP system you must
first prepare it for commissioning
(see "CP system" manual).
Before commissioning the CP system on the RIO net-
work proceed as follows:
1. Connect the operating voltage of the node (see "CP
system" manual).
2. Connect the CP modules.
3. Switch on the operating voltage.
4. Save the line assignment by pressing the SAVE
button.
5. Switch off the operating voltage for the node.
2. Commissioning
CP FB8 9809a
2-3
Summary of Contents for Compact Performance Series
Page 2: ......
Page 12: ...Contents and general safety instructions X CP FB8 9809a...
Page 13: ...Chapter 1 Installation 1 Installation CP FB8 E 9809a 1 1...
Page 28: ...1 Installation 1 16 CP FB8 E 9809a...
Page 29: ...Chapter 2 Commissioning 2 Commissioning CP FB8 9809a 2 1...
Page 43: ...Chapter 3 Diagnosis 3 Diagnosis CP FB8 9809a 3 1...
Page 51: ...Appendix A Technical appendix A Technical appendix CP FB8 9809a A 1...