MACHINES AND
ACCESSORIES
Page 25 of 55
Al
lr
ig
ht
s
ar
e
re
se
rv
ed
of
re
pr
od
uc
tio
n
an
d
di
ss
em
in
at
io
n
of
th
is
Te
ch
ni
ca
lM
an
ua
la
nd
do
cu
m
en
ta
tio
n
ci
te
d
an
d/
or
at
ta
ch
ed
.I
ti
s
ex
pr
es
sl
y
fo
rb
id
de
n
to
re
pr
od
uc
e,
pu
bl
is
h
or
di
st
rib
ut
e
an
y
in
fo
rm
at
io
n
fr
om
th
is
M
an
ua
l.
Co
py
rig
ht
by
FE
RV
I
8 TRANSPORT AND LIFTING
The weight of the
P
LANER
is 164 kg,
therefore
it
can
only
be
lifted
and
transported using equipment suitable for the
task.
The optimum solution for handling is to use
a pallet truck or a forklift truck with
sufficient capacity.
To carry out the lifting of the Planer steel
ropes must be used with a diameter greater
than 5 mm.
To do so, follow the instructions below:
disconnect the power plug from the
outlet and pick up the cable, making
sure that will not be damaged during
transport;
secure all the parts of the Planer in
order
to
prevent
unexpected
movement of moving parts;
after verifying that the equipment is
properly
secured,
carefully
begin
lifting.
Figure 18 – Lifting the machine.
Machine transport
All transport operations must ALWAYS be carried out when the machine is stopped and
no metal pieces are on the machine table.
ALWAYS disconnect the power plug.
The use of a forklift should only be performed by trained and qualified personnel.
fervi.com