Test Run

1

2

3

4

5

Test Run

Result 

 Step 

Check 

Check the voltage of power 
supply 

Turn the ground-fault circuit 
breaker on   

Turn the power switch on 

Dry hands 

Is single-phase alternating 
current 220V

240V 

 (100-120V)  used?  

Does the power indicator light 
up?  

Is the air blowing?  

Is the unit installed firmly? 
Any vibration or strange noise?  

Check the unit 

Do not turn the unit power switch on with your hands inside.

If the self-check indicator in the display lights or is flashing, turn off the power switch off, 

   and turn the power back on when all  the indicators go off (after 40 seconds).  

Confirm ON

1

230mm

200mm

2

Power connection 

The second method of power connection (cut-off plug)
     Embed the switch box (with no cover) in 
     the installation position, used to connect 
     the power line (the combination of green 
     and yellow wires is ground wire).
     If not using the switch box, the 
     power supply line will be squeezed
     out of the unit body and cannot be 
     fixed firmly.

Power cord 
(with ground 
wire)

Cut off the plug of the 
power cord

Remain about 30cm long power cord 
connecting to the unit

14

3

230mm

230mm

After hanging the unit 
on the wall, connect 
the remaining power 
cord to the power 
socket on the wall 
(below the unit).

Power connection 
position (at the bottom
 of unit)
Power socket on the 
wall (below the unit)

Switch box

floor

Summary of Contents for 300

Page 1: ...Usage and Installation Manual Dual Jet High Speed Hand Dryer N831 R00 23 03 20...

Page 2: ...y environmentfriendlyanddurability Two airstreamsof highspeed injection dry water drip off your hands within 7 seconds and give you convenience and comfort Thisunitisapplicabletothehomes restaurants b...

Page 3: ...in the bathtub or shower room Do not allow the unit get wet Prohibit disassembling Important Always follow instructions closely Earth grounding connection WARNING If you don t use this unit properly...

Page 4: ...supply Air Speed switch Press the Air Speed switch high speed and low speed switches are changeable Power indicator lamp is red when the high speed switch is turned on while the power lamp is green w...

Page 5: ...unit Note Draining and Cleaning the drain tank Before it fills up at least once a week The water blown off the hands is called drain water Empty the drain water at any moment in order to prevent accum...

Page 6: ...e top panel Push it all the way inward until it stops Dirt and dust may get into the unit and shorten its working life if the air filter is out of position Re attach to the unit As the original Align...

Page 7: ...cover of terminal box check the fuse terminal connector whether burnt or not Turn the power switch off Check all the indicators in the display area have gone off around 40 seconds then turn on the pow...

Page 8: ...lot of condensation Locations where corrosive neutral or reductive gases are present Installation position guide Leave at least 400mm clearance at both sides to make it easier to use Install the unit...

Page 9: ...g screws as shown the below figure Rear backinstallation panel Anti theft screw Installation panel Power connection Use a single phase 220 240V power 2 2 A single wire cable core between 2 0mm and 2 5...

Page 10: ...tors go off after 40 seconds Confirm ON 1 230mm 200mm 2 Power connection The second method of power connection cut off plug Embed the switch box with no cover in the installation position used to conn...