Copyright by FENECON GmbH
Meter Configuration
–
SOCOMEC
For installation and configuration of the meter
(SOCOMEC Diris A10)
, please refer to the "Installation
and configuration instructions for FEMS package 3-
phase sensor without current transformer". You can
find this on our website in the download center.
33
The meter package
includes
the SOCOMEC Diris A10
meter and the corresponding FEMS app for Socomec
meters. The current transformers are
not
part of the
delivery.
Note:
AC generator meters are
not
part of the scope of
delivery! However, for a correct display of
consumption and generation in the online
monitoring, the generation must be measured!
Attention:
The transformer ratio (secondary
current) in this case is 5.