Copyright by FENECON GmbH
Wiring of KACO Inverter
Overview
1
DC connection BMS box or string collection box (if installed) - Power Out +
2
DC connection BMS box or string collection box (if installed) - Power Out -
3
Communication FEMS (LAN)
4
Communication to additional inverters
5
AC grid connection (
AC connection cable not included in the scope of delivery
)
1.
Cut off DC cable end to required length
2.
Mark DC cable end (pay attention to polarity)
3.
Press on ring cable lugs 35 mm² M10
Ring cable lugs for AC mains connection are
included in the scope of delivery
1
2
3
4
1
2
3
5
4
5
29