TATE DIGITAL WALL MOUNTED MIXER INSTALLATION GUIDE

1

  Ensure that the Digital Mixer is installed correctly installed according to the instructions above. 

      Turn on the water supply and check the unit and plumbing for leaks. Once the plumbing is confirmed to

 

      be water-tight, connect the power supply and conduct the operational test below.

OPERATIONAL TEST

OPERATING THE CONTROL SYSTEM

1 Open

Push the interface once. The interface turns on and the 

LED illuminates.

2 Close

Push the interface again. The interface turns off and the 
LED goes off.

Summary of Contents for TATE

Page 1: ...1 TATE DIGITAL WALL MOUNTED MIXER INSTALLATION GUIDE INSTALLATION GUIDE TATE Digital Wall Mounted Mixer...

Page 2: ...2 FELTON...

Page 3: ...NSTALLATION GUIDE Control Unit Installation 8 Measurements 7 Tools Required 4 Notice 4 Scope of Application 7 Digital Mixer Installation 12 Operational Test 19 CONTENTS Troubleshooting 20 Warranty 21...

Page 4: ...HOCK ELECTRICAL INSTALLATION Before opening the housing the mains connection must be switched off Work on electrical parts and connections must be carried out by qualified electrician Country specific...

Page 5: ...l Data Cable 10m BOX 3 WALL MOUNTED SPOUT 1 x Key 1 x Flow Straightener 0 ring Seal Spout Base Grub Screw x2 Sleeve Spout Aerator Flow Regulator 3 x Aerators Flow Regulators 1x is prefitted to the spo...

Page 6: ...ace with a flow straightener full flow FLOW REGULATORS Pink Flow Regulator 4l min Blue Flow Regulator 6l min White Flow Regulator 8l min factory fitted There additional flow regulators supplied in the...

Page 7: ...l electrical installations are installed by a registered electrician and complies with the Electrical Safety Regulations of NZ Important The Digital Mixer must have an access panel Hot in Cold in Spou...

Page 8: ...t for ease of maintenance The Control Tube can be reduced in length if required by cutting along the cutting slot see Fig 2 Prepare a 30 32mm hole in the finished wall deck or counter vanity Position...

Page 9: ...is protected with a plastic sleeve leave this on until later in the installation Control Mounting Tube Data Cable Push the Control Mounting Tube into the hole until the front flange sits against the w...

Page 10: ...astic Mounting Tube This tightens the lugs on the inside of the wall Tighten until there is no rotation of the Control Housing 6 7 Pull the red strip to release the connector from the plastic sleeve P...

Page 11: ...MOUNTED MIXER INSTALLATION GUIDE 8 Thread in the cable and fit the Control Wheel onto the Housing Fit the Control Sleeve onto the Control Wheel Ensure that you fit the Control Sleeve in the correct o...

Page 12: ...FELTON 10 Inside the Temperature Control Unit 9 Remove the cover DIGITAL MIXER INSTALLATION Outlet Hot Cold Inlets Fixing holes Fixing hole Cover retaining holes Transformer 12V wall plug Control uni...

Page 13: ...ING FOR NOG MOUNTING FOR CONCRETE 2 Install the Digital Mixer 99mm 1 Mark fixing holes 56mm 2 Drill fixing holes 99mm 56mm 5mm 3 Install the Digital Mixer If installed vertically use orientation shown...

Page 14: ...er supply feed Large retaining bolt A Connect the brass adaptors into the flexi hoses B Fit both flexi hoses with the brass adaptor on firmly into the unit box C Fit the large retaining bolt with a to...

Page 15: ...ALLATION GUIDE DIGITAL MIXER INSTALLATION A Fit the outlet pipe on to the brass connectors B Push the outlet fitting into the Digital Mixer and fit a small retaining bolt with torx screw driver suppli...

Page 16: ...the socket Feed the cable through the one of the guide slots in the front of the Digital Mixer Data Cable connection 15 Connect the power cable coming from the transformer Use the connector and push f...

Page 17: ...UIDE 16 Fit the cover back on to the base Using a Phillips screwdriver secure the cover in position The unit is now ready for commissioning Please see User Guide IMPORTANT Fit cables into slots to all...

Page 18: ...1 2 BSP Ensure the base fits tightly and firmly against the wall and seals 3A Fit the spout onto the base ensuring the sleeve stays on the spout and secure both grub screws using a 2 5mm allen key no...

Page 19: ...ater supply and check the unit and plumbing for leaks Once the plumbing is confirmed to be water tight connect the power supply and conduct the operational test below OPERATIONAL TEST OPERATING THE CO...

Page 20: ...essure between hot and cold water is greater than 100kPa Balance pressure to eliminate difference Constant flow of water Unit will not turn off Carry out function Diagnostic Test in User Guide The wat...

Page 21: ...oes not cover any damage to product due to abuse negligence or improper installation This warranty is given on the understanding that the product is installed by a registered plumber and operated acco...

Page 22: ...22 FELTON...

Page 23: ...23 TATE DIGITAL WALL MOUNTED MIXER INSTALLATION GUIDE...

Page 24: ...ELTON felton industries limited FeltonIndustriesLimited feltonltd feltonltd feltontapware FELTON INDUSTRIES LTD 8 Farmhouse Lane St Johns Auckland 1072 w w w felton co nz Find us on Social Media 09032...

Reviews: