
1-800-888-2418 | www.feeneyinc.com
7
Step 3A – A
ach Moun
ঞ
ng Plate
A ach the moun ng plate to the post using two of the provided
#8 x 3/4” self-tapping screws
(See Figure 3.1).
Important: Use only the top two moun
ࢼ
ng holes at this
ࢼ
me.
Step 2B – Con
ঞ
nued
For systems with Series 150 top rail:
String an extension cable between each post, feeding it through
the RCB and 1/2" hole, then connect a 2-way spli er. Feed one
branch of the spli er out through the 1/2" lead wire pilot hole
drilled in the previous step, this becomes the lead wire for the
light at this post. Feed the other branch of the 2-way spli er
through the 1/2" hole and the hollow of the RCB and connect
an extension cable
(See Figure 2.4).
Note: A 2-way spli
er does not need to be used at the
fi
nal post, as the
extension cable will connect to the
fi
nal light to complete the circuit.
Use masking tape to temporarily secure lead wire to outside of
post to prevent retrac ng back into post.
Step 3 - Install Post Accent Lights
Figure 2.4
Figure 3.1
EXTENSION
CABLE
LEAD WIRE
2-WAY
SPLITTER