
1-800-888-2418 | www.feeneyinc.com
5
Step 1B – Con
ঞ
nued
For systems with Series 150 top rail:
Drill a 1/2” diameter hole ver cally centered between the
factory pre-drilled top rail RCB holes. This will allow the LED
2-way spli er and LED extension cable to pass through the RCB
hollow
(See Figure 1.4).
Repeat this step for each post which will
have post accent lights installed. For stair posts, pre-drill top rail
RCB holes as needed, and then pre-drill 1/2" diameter hole.
Pull one branch of the LED 2-way spli er out through drilled
hole between RCB holes, and a ach LED Extension Cable to the
other branch
(See Figure 1.5).
IMPORTANT NOTE:
Maintaining the polarity at all con-
nec on points is cri cal. Constant alignment veri
fi
-
ca on of the of the posi ve and nega ve signs will
guarantee less problems and rework.
Use masking tape to temporarily secure starter cable to outside
of post to prevent retrac ng back into post.
1/2" HOLE
1-3/16"
1/2"
TOP OF POST
Figure 1.4
Figure 1.5
2-WAY SPLITTER
STARTER CABLE
MALE CONNECTOR
FEMALE CONNECTOR
Keep the straight line
on the outside ma
ࢼ
ng
connec
ࢼ
on aligned