background image

HPB

TM

 Series

  Revised February 19, 2018 4:19 PM

Visit 

Our Website For the Latest 

Version of 

This D

ocument and 

More I

nformation. 

www.fedco-usa.com

FEDCO USA

FEDCO

800 Ternes Drive

Monroe, MI 48162, USA

Telephone: 

+1 (734) 241-3935

 

Fax: 

734-241-5173 

Email: 

[email protected]

FEDCO UAE 

Office 1910 | Concord Tower

P.O. Box 282102 | Media City

Dubai, United Arab Emirates

Telephone: 

+971 (0)4 242 3856

Fax: 

+971 (0)4 242 3856

Email: 

[email protected]

FEDCO SINGAPORE 

(No Office Address)

 

Telephone: 

+(65) 9784 3813

Email: 

[email protected]

Service Center

FEDCO Sales Office

Summary of Contents for HPB-2800

Page 1: ...tion Operation Manual 01 28C XXXXXX 0 INSTALLATION OPERATION MANUAL www fedco usa com ONE COPY OF THIS MANUAL MUST REMAIN WITH THE EQUIPMENT AT ALL TIMES English Version Models HPB 2800 HPB HYDRAULIC...

Page 2: ...ter protect our environment 3 FEDCO achieved ISO 14001 registration in September 2017 R E G I S T E R E D ISO 1 4 0 0 1 2 0 1 5 ISO 9 0 0 1 2 0 1 5 R E G I S T E R E D CE Stamp CE marking confirms tha...

Page 3: ...s maintenance and lo gistics issues associated with oil or grease lubricated bearing systems We offer three materials of construc tion Duplex SS Super Duplex SS and 316 SS We design fluid machines to...

Page 4: ...g and Handling 10 Baseplate Installation 11 Installation Configurations 12 Booster Piping Connections 14 Recommended Instrumentation and Operation With VFD 18 Upstream Filtration 18 Start Up Check Lis...

Page 5: ...occurred during shipping If damage is present or if the contents are incomplete please contact your shipping company or a FEDCO representative before proceeding Item Description Item Description 1 Br...

Page 6: ...for an indefinite period of time Do not remove the protective covers until ready to install Long Term Storage 6 Months Checklist 1 Check caps to ensure they have not been damaged or allowed debris in...

Page 7: ...al pressure increase before passing to the membrane The high pressure brine steam from the membrane is directed back to the HPB The HPB recovers the pressure energy and discharges the brine at low pre...

Page 8: ...rating and maintenance procedures that involve exposure to potentially hazardous situations The levels of hazardous situations are as follows Hazards which are IMMEDIATELY ACCESSIBLE and capable of ca...

Page 9: ...or the use of parts not provided by FEDCO If there is a question regarding the intended use of the equipment please contact a FEDCO representative before proceeding WARNING Do not use the equipment f...

Page 10: ...te Deter mine the weight of the unit to select an appropri ate lifting method Suitable lifting equipment such as lifting straps or cables should always be used to prevent damage to the equipment NEVER...

Page 11: ...ms are properly sized and installed in cases of uneven surfaces PROPER SHIM PLACEMENT NOT SUPPLIED BY FEDCO MINIMUM 6000 lb STEEL REINFORCED CONCRETE EIGHT 8 1 8 X 12 WEDGE TYPE ANCHOR BOLTS NOT SUPPL...

Page 12: ...The throttle valve should be located between the feed pump and the HPB feed inlet If the feed pump speed is controlled by a variable frequency drive VFD a throttle valve is not required NOTES Minimum...

Page 13: ...rge pressure with the HPB in operation A pressure relief valve is also necessary and should be installed between the HPB feed outlet and the system membrane inlet CAUTION If the feed pump and motor ar...

Page 14: ...cations Align all piping carefully before installing couplings Make sure all seals seat correctly inside the coupling If piping or seals are not aligned correctly leaking may occur under pressure Prov...

Page 15: ...10 0 2 5 1 36 0 26 21 6 6 625 168 3 0 0 10 0 2 5 1 5 0 17 14 8 8 625 219 1 0 0 10 0 2 5 0 50 0 14 11 10 10 750 273 0 0 0 10 0 2 5 0 40 0 11 9 12 12 750 323 9 0 0 10 0 2 5 0 34 0 09 7 Figure 16 Flexib...

Page 16: ...t be no more than a maximum of 5 degrees from each other Take appropriate measures to compensate thermal expansion of the piping Measure and record the flange gaps in the Start Up Records section of t...

Page 17: ...uld disrupt booster operating Pressure gauges are recommended to allow measurement of booster inlet pressure Outlet Piping To achieve an accurate pressure reading the pressure gauges sensor needs to b...

Page 18: ...auges should be installed at all four points going into and out of the HPB to monitor booster performance Refer to the rear of the HPB Start Up tag for equipment specifications Figure 21 Recommended I...

Page 19: ...place Preparation For Booster Start Up Start Up Precautions WARNING NEVER operate the equipment Below the minimum flow rate When dry Without proper guards and safety devices installed With the discha...

Page 20: ...ephone or fax FEDCO will give you easy step by step instruc tions on how to proceed Visual Inspection Make sure all items are accounted for on the start up check list Inspect all high pressure booster...

Page 21: ...ck rotational direction of feed pump motor Restriction in inlet or discharge pipes Check feed pump discharge pressure Check position of all auxiliary valve HPB internal issues Refer to the HPB 2800 Ov...

Page 22: ...r Screws 16 N m 12 Lb ft Casing Plug Bolts 1356 N m 1000 Lb ft Bearing Carrier Retaining Clip Bolts 10 N m 7 Lb ft Bearing Carrier Bolts 271 N m 200 Lb ft Pump Foot Casing Bolts 1356 N m 1000 Lb ft Pu...

Page 23: ...and baseplate with a clean damp cloth Every five 5 years 1 Annual maintenance per above 2 A complete disassembly cleaning and detailed inspection of all booster components is recom mended Refer to Boo...

Page 24: ...ced in accordance with the FEDCO warranty Use the following address to return parts ATTN Field Service Department FEDCO 800 Ternes Drive Monroe MI 48162 USA Additional Contact Information Tel 734 241...

Page 25: ...Pump Outlet Pressure ______________ Turbine Outlet Pressure ______________ Pump Flow ______________ Turbine Brine Flow ______________ Bypass Flow Rate ______________ If equipped Aux Valve Position OPE...

Page 26: ...CLOSED Operating Data After Overhaul Pump Inlet Pressure ______________ Turbine Inlet Pressure ______________ Pump Outlet Pressure ______________ Turbine Outlet Pressure ______________ Pump Flow _____...

Page 27: ..._____________________ Pump Inlet Pressure ______________ Turbine Inlet Pressure ______________ Pump Outlet Pressure ______________ Turbine Outlet Pressure ______________ Pump Flow ______________ Turbi...

Page 28: ...___________________________________________________________________________ _____________________________________________________________________________ ______________________________________________...

Page 29: ...rive Monroe MI 48162 USA Telephone 1 734 241 3935 Fax 734 241 5173 Email sales fedco usa com FEDCO UAE Office 1910 Concord Tower P O Box 282102 Media City Dubai United Arab Emirates Telephone 971 0 4...

Reviews: