5.2
Operation
for Planned Power Outages
- 28 -
•
O
peration after planned power outage
1.
Check that the UPS is connected to the input power source and the
connected device.
The RUN LED (green) on the front of the UPS will flash slowly
(1.6 second cycle).
2.
Press the RUN/STOP switch on the front of the UPS for 1
second. When the
power is on, a warning beep will sound.
3.
AC voltage is output from the AC outlet or the output terminal block, and the
RUN LED (green) on the front of the UPS lights up.
4.
When normal operation has started, turn on the connected device.
For details, refer to Chapter 4.1 “Turning on the UPS”.
When a warning beep sounds: Refer to Chapter 6.1
Warning Beep Sound