50
ALUM AIR INSULATION
1. Install the Alum-Air Insulation on top of the Ins following the same map and installation order.
2. The Openable Level 1 of the Alum-Air insulation is to be installed at the end of the process.
Openable Alum-Air
Insulation layer
Level 1
Level 2
Level 3
Level 4
Level 5
Level 2
Level 3
Level 4
Level 5
Ins and Alum Air Insulation
WITH Skylight Window
Drawing 29
Ins and Alum Air insulation Cross-section
Dome with Skylight Window
Summary of Contents for GLAMPING 20
Page 1: ...ASSEMBLY MANUAL GLAMPING 20 30 40 50...
Page 2: ......
Page 34: ...34 Map 1A CAMPING DOOR FG20 INSULATION P3 ENTRANCE...