25
Drawing 23, 24, 25
The drawing shows how to insert the door in the dome framework of the indicated dome size.
K
K
L
L
M
M
K
K
L
L
M
M
K
K
L
L
M
M
-Clamp
-Clamp
Drawing 23
FG30
Drawing 24
FG40
Drawing 25
FG50
STEP 5:
Check the leveling of the doors by positioning the spirit level on top of the door wing. You are able to adjust
the position of the door frame as the pipes supplied (M, L, K) give you the room for adjustment on both ends.
The pipes themselves are telescopic as well. Simply undo the mid screw and extend / shorten the length
of the pipe to the length you require.
CONGRATULATIONS!
YOU HAVE JUST FINISHED
BUILDING THE DOME’S
FRAMEWORK :)
Summary of Contents for GLAMPING 20
Page 1: ...ASSEMBLY MANUAL GLAMPING 20 30 40 50...
Page 2: ......
Page 34: ...34 Map 1A CAMPING DOOR FG20 INSULATION P3 ENTRANCE...