![Fayat Dynapac DFP9 Operating Instruction, Maintenance Instruction Download Page 81](http://html1.mh-extra.com/html/fayat/dynapac-dfp9/dynapac-dfp9_operating-instruction-maintenance-instruction_546868081.webp)
4.
Slightly loosen the fastening screws (2) on both sides.
5.
Pull the engine carrier forward, remove and replace the V-
belt (1).
6.
Install the new V-belt and pull the engine carrier back.
7.
Tighten the fastening screws (1) on both sides.
8.
Check tension of V-belt, tighten if necessary.
ð
Compression measurement:
approx. 5 mm (0.2 in).
9.
Assemble the V-belt guard (1) with fastening screws (2).
10.
Check the V-belt tension again after 25 operating hours,
tighten if necessary.
8.8.3.1
Checking the frequency of the base plate
Keep feet and hands clear of the vibrating base plate.
2
B-834-0170
1
Fig. 73
1
B-834-0171
Fig. 74
Fig. 75
B-834-0144
1
2
Fig. 76
Maintenance – Annually
DFP9
81
Summary of Contents for Dynapac DFP9
Page 6: ...Table of contents DFP9 6 ...
Page 7: ...1 Introduction Introduction DFP9 7 ...
Page 11: ...2 Technical data Technical data DFP9 11 ...
Page 15: ...3 Concerning your safety Concerning your safety DFP9 15 ...
Page 39: ...4 Indicators and control elements Indicators and control elements DFP9 39 ...
Page 45: ...5 Checks prior to start up Checks prior to start up DFP9 45 ...
Page 52: ...Checks prior to start up Checking the water level topping up DFP9 52 ...
Page 53: ...6 Operation Operation DFP9 53 ...
Page 63: ...7 Loading transporting the machine Loading transporting the machine DFP9 63 ...
Page 67: ...8 Maintenance Maintenance DFP9 67 ...
Page 97: ...9 Troubleshooting Troubleshooting DFP9 97 ...
Page 103: ...10 Disposal Disposal DFP9 103 ...
Page 105: ......
Page 106: ......