1.
Hold the hexagon nut (1) on the rocker arm and loosen
counter nut (2).
2.
Adjust the hexagon nut, until the feeler gauge can be
inserted and pulled out with little resistance after retightening
the counter nut.
1.
Install the valve cover (2) with a new seal (3).
2.
Tighten the fastening screws (1) evenly.
3.
After a short test run, check the engine for leaks.
8.8.3 Replacing the V-belt
Protective equipment:
n
Working clothes
n
Safety shoes
n
Protective gloves
1.
Park the machine safely
Chapter 6.5 ‘Parking the machine
in secured condition’ on page 61
2.
Allow the engine to cool down.
3.
Loosen the fastening screws (2) and remove the V-belt guard
(1).
Adjusting the valve clearance
Fig. 70
Final work
Fig. 71
B-834-0144
1
2
Fig. 72
Maintenance – Annually
DFP9
80
Summary of Contents for Dynapac DFP9
Page 6: ...Table of contents DFP9 6 ...
Page 7: ...1 Introduction Introduction DFP9 7 ...
Page 11: ...2 Technical data Technical data DFP9 11 ...
Page 15: ...3 Concerning your safety Concerning your safety DFP9 15 ...
Page 39: ...4 Indicators and control elements Indicators and control elements DFP9 39 ...
Page 45: ...5 Checks prior to start up Checks prior to start up DFP9 45 ...
Page 52: ...Checks prior to start up Checking the water level topping up DFP9 52 ...
Page 53: ...6 Operation Operation DFP9 53 ...
Page 63: ...7 Loading transporting the machine Loading transporting the machine DFP9 63 ...
Page 67: ...8 Maintenance Maintenance DFP9 67 ...
Page 97: ...9 Troubleshooting Troubleshooting DFP9 97 ...
Page 103: ...10 Disposal Disposal DFP9 103 ...
Page 105: ......
Page 106: ......