![Fayat Dynapac CC1300 Instruction Manual Download Page 65](http://html1.mh-extra.com/html/fayat/dynapac-cc1300/dynapac-cc1300_instruction-manual_546864065.webp)
Miscellaneous
4812161001_J.pdf
2020-02-03
Securing CC1300 for loading
Securing the CC1300 vibratory roller from Dynapac for
transport.
Direct of travel
Roller loaded in forward
direction
1 - 2
3 - 4
= double lashings, i.e. one lashing with two parts secured to two different lashing mounts,
symmetrically located on the right and left sides.
1 - 2
3 - 4
= double lashings, i.e. one lashing with two parts secured to two different lashing mounts,
symmetrically located on the right and left sides.
5
= rubber
5
= rubber
The lashings' permitted distance interval in meters
The lashings' permitted distance interval in meters
(1 - 4: Double lashings, LC at least 1.7 tonnes (1700 daN), S
TF
300 kg (300daN))
(1 - 4: Double lashings, LC at least 1.7 tonnes (1700 daN), S
TF
300 kg (300daN))
Double L
1
- L
2
Double L
3
- L
4
Double L
1
- L
2
Double L
3
- L
4
0,6 - 3,0
0,1 - 3,0
0,6 - 3,0
0,1 - 3,0
The distance
L
1
above is between points
D
and
E
.
D
is the projected point directly at right angles laterally in relation to
the edge of the platform from the lashing mount
C
on the roller.
E
is the lashing mount at the edge of the platform.
L
2
–
L
3
have a corresponding relationship.
The distance
L
1
above is between points
D
and
E
.
D
is the projected point directly at right angles laterally in relation to
the edge of the platform from the lashing mount
C
on the roller.
E
is the lashing mount at the edge of the platform.
L
2
–
L
3
have a corresponding relationship.
55
Summary of Contents for Dynapac CC1300
Page 2: ......
Page 10: ... e 4812161001_J pdf 2020 02 03 ...
Page 14: ...Introduction 4812161001_J pdf 2020 02 03 4 ...
Page 22: ...Special instructions 4812161001_J pdf 2020 02 03 12 ...
Page 32: ...Machine description 4812161001_J pdf 2020 02 03 22 ...
Page 38: ...Machine description 4812161001_J pdf 2020 02 03 28 ...
Page 58: ...Operation 4812161001_J pdf 2020 02 03 48 ...
Page 68: ...Operating instructions Summary 4812161001_J pdf 2020 02 03 58 ...
Page 70: ...Operating instructions Summary 4812161001_J pdf 2020 02 03 60 ...
Page 72: ...Preventive maintenance 4812161001_J pdf 2020 02 03 62 ...
Page 81: ...Maintenance Maintenance schedule 4812161001_J pdf 2020 02 03 Service Checklist 71 ...
Page 82: ...Maintenance Maintenance schedule 4812161001_J pdf 2020 02 03 72 ...
Page 94: ...Maintenance 50h 4812161001_J pdf 2020 02 03 84 ...
Page 98: ...Maintenance measures 250 h 4812161001_J pdf 2020 02 03 88 ...
Page 106: ...Maintenance measures 500 h 4812161001_J pdf 2020 02 03 96 ...
Page 116: ...Maintenance 1000h 4812161001_J pdf 2020 02 03 106 ...
Page 130: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...