Maintenance - 1000h
4812161001_J.pdf
2020-02-03
Maintenance - 1000h
Performed after 1000 operating hours (each year)
Park the roller on a level surface.
The engine must be switched off and the
parking brake activated when checking or
adjusting the roller, unless otherwise specified.
Park the roller on a level surface.
The engine must be switched off and the
parking brake activated when checking or
adjusting the roller, unless otherwise specified.
Ensure that there is good ventilation (air
extraction) if the engine is run indoors. Risk of
carbon monoxide poisoning.
Ensure that there is good ventilation (air
extraction) if the engine is run indoors. Risk of
carbon monoxide poisoning.
Battery
- Check condition
Fig. Battery
The battery is sealed and maintenance-free.
Make sure there is no open flame in the vicinity
when checking the electrolyte level. Explosive gas
is formed when the alternator charges the battery.
Make sure there is no open flame in the vicinity
when checking the electrolyte level. Explosive gas
is formed when the alternator charges the battery.
When disconnecting the battery, always
disconnect the negative cable first. When
connecting the battery, always connect the
positive cable first.
When disconnecting the battery, always
disconnect the negative cable first. When
connecting the battery, always connect the
positive cable first.
The cable shoes should be clean and well-tightened.
Corroded cable shoes should be cleaned and greased
with acid-free Vaseline.
Wipe the top of the battery.
97
Summary of Contents for Dynapac CC1300
Page 2: ......
Page 10: ... e 4812161001_J pdf 2020 02 03 ...
Page 14: ...Introduction 4812161001_J pdf 2020 02 03 4 ...
Page 22: ...Special instructions 4812161001_J pdf 2020 02 03 12 ...
Page 32: ...Machine description 4812161001_J pdf 2020 02 03 22 ...
Page 38: ...Machine description 4812161001_J pdf 2020 02 03 28 ...
Page 58: ...Operation 4812161001_J pdf 2020 02 03 48 ...
Page 68: ...Operating instructions Summary 4812161001_J pdf 2020 02 03 58 ...
Page 70: ...Operating instructions Summary 4812161001_J pdf 2020 02 03 60 ...
Page 72: ...Preventive maintenance 4812161001_J pdf 2020 02 03 62 ...
Page 81: ...Maintenance Maintenance schedule 4812161001_J pdf 2020 02 03 Service Checklist 71 ...
Page 82: ...Maintenance Maintenance schedule 4812161001_J pdf 2020 02 03 72 ...
Page 94: ...Maintenance 50h 4812161001_J pdf 2020 02 03 84 ...
Page 98: ...Maintenance measures 250 h 4812161001_J pdf 2020 02 03 88 ...
Page 106: ...Maintenance measures 500 h 4812161001_J pdf 2020 02 03 96 ...
Page 116: ...Maintenance 1000h 4812161001_J pdf 2020 02 03 106 ...
Page 130: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...