![Fayat Group BOMAG BP 20/50 Operating Instructions Manual Download Page 50](http://html1.mh-extra.com/html/fayat-group/bomag-bp-20-50/bomag-bp-20-50_operating-instructions-manual_546912050.webp)
As required
BOMAG
55
BP 20/50, BP 25/50
l
Unscrew the fuel sludge filter (2), empty it and
reassemble it leak tight with a new seal ring
(3).
l
Unscrew the carburettor drain screw (4), let all
fuel run out of the carburettor and turn the
screw tightly back in again.
Fig. 70
l
Pull off the spark plug socket (1) (Fig. 70) and
unscrew the spark plug (2).
l
Fill in several drops of fresh engine oil through
the ignition plug opening.
l
Crank the engine several times with the recoil
starter to distribute the oil.
l
Screw the spark plug back in.
Fig. 71
l
For this purpose align triangle mark (1) (Fig.
71) on the starter disc to the top bore (2).
i
Note
Intake and exhaust valves closed. The combus-
tion chamber is protected against corrosion.
l
Cover the engine to protect it against dust and
moisture.
i
Note
Depending on weather conditions these conserva-
tion measures will protect the machine for approx.
6 to 12 months.
!
Caution
A machine with conserved engine must be
clearly marked by attaching a clear warning
tag.
Go
to
Discount-Equipment.com
to
order
your
parts