![Fayat Group BOMAG BP 20/50 Operating Instructions Manual Download Page 43](http://html1.mh-extra.com/html/fayat-group/bomag-bp-20-50/bomag-bp-20-50_operating-instructions-manual_546912043.webp)
Maintenance every 6 months
BOMAG
48
BP 20/50, BP 25/50
5.16 Checking, tensioning the V-
belt, replacing it if neces-
sary
Checking the V-belt
Fig. 53
l
Remove the V-belt guard.
l
Check the condition and tension of the V-belt
(Fig. 53), replace the V-belt if damaged.
i
Note
Compression measurement approx. 5 - 10 mm.
Changing the V-belt
Fig. 54
l
Slightly loosen two fastening screws (1) (Fig.
54) on both sides of the engine carrier.
l
Push the motor carrier forward and take the V-
belt off.
l
Install the new V-belt.
Tightening the V-belt
Fig. 55
l
Pull the engine carrier back (Fig. 55), until the
correct V-belt tension is achieved and tighten
the fastening screws (1).
l
Assemble the V-belt guard.
!
Caution
Check the V-belt tension again after a running
time of approx. 25 operating hours, retighten if
necessary.
Go
to
Discount-Equipment.com
to
order
your
parts