a D:GROUP Company
00254EN – Rev. 01 – 11/2012
43
13.G DEHS TEST FOR HEPA FILTERS
OBJECT AND PRINCIPLE OF THE TEST:
Check of the integrity of the HEPA filters through an analysis of the filtering system, able to find out possible
small leaks and/or defects altering the efficiency of the filters and at the same time to test leaks around
gaskets.
The HEPA filter system fitted to the isolator is tested for leakage by subjecting it to an aerosol on the
upstream side and measuring passage of the aerosol to the downstream side
INSTRUMENTS TO BE USED FOR TESTING:
1.
Aerosol generator
2.
Photometer
REAGENTS:
Liquid aerosol agent composed of Emery 3004 or equivalent in concentration of 60
µ
g/l.
Suitable measures must be taken to prevent or reduce the operator’s exposure to aerosol.
TEST PROCEDURE:
The photometer must be used at a threshold sensitivity specific to the test aerosol of 0.0001
µ
g/l and
capable of measuring aerosol concentrations up to about 80
µ
g/l.
The test must be performed as follows:
–
Place the aerosol generator in such a way that the aerosol produced is immediately catched by the
barrier airflow and then recycled into the intake channel
–
Switch the generator on and adjust the photometer to give a reading of 100% when sampling this
concentration
–
Ensure that the threshold of reading sensitivity of the photometer is 0.0001
µ
g/l.
–
Operate the isolator with airflow velocity as per specs.
–
Using a sampling probe attached to the photometer scan the filters’ faces, seals and construction joints,
moving the sampling probe at not more than 30 mm/s
–
Check the values read by the photometer constantly, in order to detect possible leakage.
–
Acceptance criteria: downstream reading must be less or equal to 0.01%
Summary of Contents for ASEPTIC
Page 45: ...a D GROUP Company 00254EN Rev 01 11 2012 45 13 IDIAGRAM FOR MAINTENANCE OPERATIONS...
Page 46: ...a D GROUP Company 00254EN Rev 01 11 2012 46...
Page 47: ...a D GROUP Company 00254EN Rev 01 11 2012 47 13 J FRONTAL DIAGRAM...
Page 48: ...a D GROUP Company 00254EN Rev 01 11 2012 48 13 K SIDE DIAGRAM...
Page 49: ...a D GROUP Company 00254EN Rev 01 11 2012 49 14 SUPPORT TABLE...
Page 52: ...a D GROUP Company 00254EN Rev 01 11 2012 52 17 WIRING DIAGRAM ASEPTIC EQUIPPED WITH CLARUS L 2...
Page 53: ...a D GROUP Company 00254EN Rev 01 11 2012 53...
Page 54: ...a D GROUP Company 00254EN Rev 01 11 2012 54...
Page 55: ...a D GROUP Company 00254EN Rev 01 11 2012 55...
Page 56: ...a D GROUP Company 00254EN Rev 01 11 2012 56...
Page 57: ...a D GROUP Company 00254EN Rev 01 11 2012 57...
Page 58: ...a D GROUP Company 00254EN Rev 01 11 2012 58...
Page 59: ...a D GROUP Company 00254EN Rev 01 11 2012 59...
Page 60: ...a D GROUP Company 00254EN Rev 01 11 2012 60 18 WIRING DIAGRAM ASEPTIC EQUIPPED WITH STERIS VHP...
Page 61: ...a D GROUP Company 00254EN Rev 01 11 2012 61...
Page 62: ...a D GROUP Company 00254EN Rev 01 11 2012 62...
Page 63: ...a D GROUP Company 00254EN Rev 01 11 2012 63...
Page 64: ...a D GROUP Company 00254EN Rev 01 11 2012 64...
Page 65: ...a D GROUP Company 00254EN Rev 01 11 2012 65...
Page 66: ...a D GROUP Company 00254EN Rev 01 11 2012 66...