13.B MEASUREMENT OF THE INTERNAL PRESSURE
Check the internal pressure by connecting a calibrated manometer to the transparent pipe in the front control
panel. Use a 3 ways “T” connector to allow the pressure transmitter and the calibrate manometer to be
connected together.
13.C MEASUREMENT OF THE NOISE LEVEL
For a correct testing the background noise in the laboratory with the isolator off should not exceed 55 dB(A).
The microphone of the phonometer must be placed at 1 m from any part of the isolator.
The sound pressure level must not be over 60 dB(A).
The measure taken must be reported in then "Test report".
13.D MEASUREMENT OF LIGHTING
Take the measure with a luxmeter placed inside the work chamber in the middle of the work surface.
Consider at least 4 readings points where the two side points should be 150mm away from the side walls and
the middle points will be spaced max. 300 mm, if possible. Then calculate the average value, which should
be at least 750 lux.
Register the average value of the lighting in the “Test report”.
13.E MEASUREMENT OF VIBRATION
Take the measures with a vibration analyzer, which is to be placed in the middle of the two central sections of
the work surface
The test must be performed firstly when the isolator is off and then when the isolator is working.
The difference of the taken values is the real datum of the isolator vibration. This value should not exceed
0.005 mm RMS
Record the data in the “Test Report”
Summary of Contents for ASEPTIC
Page 45: ...a D GROUP Company 00254EN Rev 01 11 2012 45 13 IDIAGRAM FOR MAINTENANCE OPERATIONS...
Page 46: ...a D GROUP Company 00254EN Rev 01 11 2012 46...
Page 47: ...a D GROUP Company 00254EN Rev 01 11 2012 47 13 J FRONTAL DIAGRAM...
Page 48: ...a D GROUP Company 00254EN Rev 01 11 2012 48 13 K SIDE DIAGRAM...
Page 49: ...a D GROUP Company 00254EN Rev 01 11 2012 49 14 SUPPORT TABLE...
Page 52: ...a D GROUP Company 00254EN Rev 01 11 2012 52 17 WIRING DIAGRAM ASEPTIC EQUIPPED WITH CLARUS L 2...
Page 53: ...a D GROUP Company 00254EN Rev 01 11 2012 53...
Page 54: ...a D GROUP Company 00254EN Rev 01 11 2012 54...
Page 55: ...a D GROUP Company 00254EN Rev 01 11 2012 55...
Page 56: ...a D GROUP Company 00254EN Rev 01 11 2012 56...
Page 57: ...a D GROUP Company 00254EN Rev 01 11 2012 57...
Page 58: ...a D GROUP Company 00254EN Rev 01 11 2012 58...
Page 59: ...a D GROUP Company 00254EN Rev 01 11 2012 59...
Page 60: ...a D GROUP Company 00254EN Rev 01 11 2012 60 18 WIRING DIAGRAM ASEPTIC EQUIPPED WITH STERIS VHP...
Page 61: ...a D GROUP Company 00254EN Rev 01 11 2012 61...
Page 62: ...a D GROUP Company 00254EN Rev 01 11 2012 62...
Page 63: ...a D GROUP Company 00254EN Rev 01 11 2012 63...
Page 64: ...a D GROUP Company 00254EN Rev 01 11 2012 64...
Page 65: ...a D GROUP Company 00254EN Rev 01 11 2012 65...
Page 66: ...a D GROUP Company 00254EN Rev 01 11 2012 66...