49
5.1.4 SERVICE RECORD
See Lubrication and Maintenance sections for details of service. Copy this page to continue record.
ACTION CODE:
CL CLEAN
L LUBRICATE
R REPACK
HOURS
SERVICED
BY
MAINTENANCE
L Boom Tilt Pivot (1 ea.)
8 Hours or Daily
L Boom Lift Parallel Linkage (4 ea.)
L Outer Boom Hinge (1 ea.)
L Outer Boom Break-Away Hg (1 ea.)
Annually
CL Machine
CL Chemical Circuit Screens (3)
L Boom Fold Hinge (2 ea.)
Summary of Contents for 973P Series
Page 1: ...1 HIGH CLEARANCE CENTER PIVOT SUSPENDED BOOM 3 PT FIELD SPRAYER 973P SERIES OPERATOR S MANUAL...
Page 45: ...45 Fig 62 BOOM TILT PIVOT 3 Grease boom tilt pivot 1 location each boom Left Right...
Page 59: ...59 7 4 ELECTRICAL SCHEMATIC OPTIONAL CABLE 10 CONSOLE 3 OR 6 BOOM SCS 440 450 CONSOLES...
Page 60: ...60 7 5 OPTIONAL CABLE FLOW CONTROLLER UP TO 6 BOOM VALVES...
Page 62: ...62 7 7 5 FUNCTION HYDRAULIC CAB BOX...
Page 63: ...63 7 8 5 FUNCTION HYDRAULIC CAB BOX SWITCH WIRING...
Page 67: ...67...