ZL1 WSC14
5
Turn Power On/Off
Turn Solution Flow On/Off
Turn Brushes On/Off
Turn Vac On/Off
Battery Power Level (0
– 4)
Machine Diagram
1. Steering, Control Panel, Main Power, Battery Power Gauge
2. (On front) Vac Hose to Recovery Tank and Waste Water
Intake Hose (On back) Squeegee Raise/Lower & Center
Pole Height Levers
3. Recovery Tank
(Detachable)
4. Solution Tank
Fill Port
5. Solution Tank
(Detachable)
6. Battery Compartment
7. Wheel
8. Scrub Deck &
Squeegee Assembly
9. Recovery Tank Lid
& Hose Fittings
10. Handlebar
11. Solution Tank Flow
Adjustment Valve, Drainage
Plug & Quick Disconnect
Preparing the Machine for Use
In order make it more compact for shipping and trans-
porting, the scrubber is packaged with the handlebar
folded, and recovery tank detached. Follow these
instructions in order to prepare the machine for use:
1. Adjust the handlebar by
pulling up on the lever on the
back right. (See top photo and
#2 in machine diagram). Adjust
to comfortable working height.
2. Mount the recovery tank on
handlebar using the two
hooks.
3. Put the lid onto the recovery
tank. Insert the connecting
hoses into the fittings on the lid
of the recovery tank as shown
in photo at right and in the
machine diagram at left (note
hoses at #2)..
4. Be sure connecting hose from solution tank is properly
fitted into the port in recovery tank as shown in machine
diagram (behind #4 Solution Tank Fill Port).
5. Check that the solution tank flow adjustment plug is
properly inserted and the quick disconnect is closed. (See
#11 in machine diagram at left.)
6. Check to see that brushes and squeegee are properly
installed and tightened.
(See “Cleaning the Squeegee” and
“Removing the Scrub Brush” later on for details about
installing/changing squeegee and brushes/scrub pads.)
7. Turn on machine and check power gauge. If it is less
than “4”, we advise charging the batteries (see instructions
on previous page regarding batteries).
Filling the Solution Tank
1. Open the solution fill port by twisting off the plug (see #4
in machine diagram at left). Make sure solution tank is
securely fitted into place. (It is detachable).
2. Check that the drainage plug is securely in place and
connection is tight. See that the solution flow valve is
open. Check for kinks, blockages or loose connection in
the tube. (See #11 in machine diagram).
3. Pour in clean water through the fill port at a temperature
that does not exceed 140°F
(50°C). Add low foam cleaning
chemical, and use mixtures recommended by the chemical
manufacturer. Do not overfill.
1
3
9
10
5
6
7
4
2
8
11