GROWSPAN
™
GOTHIC PRO GREENHOUSES AND SYSTEMS
28
Revision date: 06.07.18
INSTALL MAIN COVER (continued)
11. Once the first cover is stretched and secure, install the
inflation fan kit in the desired location and according to
the instructions sent with the kit.
Install the Inflation Fan Kit
before
installing the second
main cover. Consult the instructions included with the
Inflation Fan Kit to install the kit.
12. After installing the inflation fan kit, repeat the steps to
install the film for the second main cover.
NOTE:
When installing the second cover film, use the
same U-channel used for the first cover film, and a
second run of spring, which is installed on top of the
first U-channel spring already in the channel.
13. With the second cover film layer installed, test the
operation of the inflation fan kit.
IMPORTANT:
If trimming the excess cover material at
the ends and sides, DO NOT remove too much of the
excess material. Some excess main cover material (the
material that extends beyond the end rafters) should
remain in place to more easily re-stretch the film if
needed.
14. Install drop-down curtain.
FRAME CHECK
Before you attach the drop-down curtain, inspect the frame
for sharp edges or fasteners that could damage the curtain
or kit components.
1. Verify that all frame members are properly secured.
2. Verify that all bolts and clamps are tight.
3. Recheck the frame assembly for sharp edges or
clamps and bolts that may interfere with the installation
of the curtain. File or tape sharp edges as needed.
4. Reposition clamps and bolts as needed and tape all
rafter pipe joints with duct tape to protect the curtain.
5. Verify that the main building frame is properly and
adequately anchored.
Do not attach the drop-down curtain to an unanchored
frame.
6. Continue by reading the baseboard and ribbon board
information that follows.
Space below is reserved for customer notes.