Farm Fans C-2130B Owner'S Manual Download Page 25

23

CORN  ...dry & cool

190 °F

210 °F

230 °F

% Unload

Dry

Capacity

% Unload

Dry

Capacity

% Unload

Dry

Capacity

in

out

Rate

Tim e

Dry Bph

Rate

Tim e

Dry Bph

Rate

Tim e

Dry Bph

17

15

69

20

940

79

17

1074

18

15

52

26

708

60

23

809

19

15

42

32

577

49

28

660

55

25

742

20

15

36

38

490

41

33

561

46

29

631

21

15

31

43

426

36

38

487

40

34

548

22

15

28

49

376

32

43

429

36

38

483

23

15

25

55

334

28

48

381

32

43

429

24

15

22

62

297

25

54

340

28

48

382

25

15

20

69

266

22

61

304

25

54

342

26

15

18

77

238

20

68

273

23

60

307

27

15

16

86

214

18

75

245

20

67

275

28

15

14

95

193

16

83

221

18

74

248

29

15

13

106

174

15

92

199

16

82

224

30

15

12

116

158

13

102

181

15

91

203

31

15

11

128

144

12

112

164

14

99

185

32

15

10

140

132

11

122

150

12

109

169

33

15

9

152

121

10

133

138

11

118

156

34

15

8

165

112

9

144

128

11

128

144

35

15

8

177

104

9

155

119

10

138

134

CORN  ...full heat

190 °F

210 °F

230 °F

% Unload

Dry

Capacity

% Unload

Dry

Capacity

% Unload

Dry

Capacity

in

*out

Rate

Tim e

Dry Bph

Rate

Tim e

Dry Bph

Rate

Tim e

Dry Bph

18

17

83

25

1125

95

21

1286

19

17

67

30

915

77

26

1046

87

23

1177

20

17

57

35

779

65

31

891

74

28

1002

21

17

50

41

680

57

36

777

64

32

874

22

17

44

46

601

50

40

687

57

36

772

23

17

39

52

534

45

45

611

51

40

687

24

17

35

58

477

40

51

545

45

45

613

25

17

31

65

426

36

57

487

40

50

548

26

17

28

72

381

32

63

436

36

56

490

27

17

25

81

342

29

71

390

32

63

439

28

17

23

90

307

26

79

351

29

70

395

29

17

20

100

277

23

87

316

26

78

356

30

17

18

110

250

21

96

286

24

86

322

31

17

17

121

228

19

106

260

22

94

293

32

17

15

132

208

18

116

238

20

103

268

33

17

14

144

192

16

126

219

18

112

247

34

17

13

155

178

15

136

203

17

121

229

35

17

12

166

166

14

145

190

16

129

214

*represents the target moisture out of the dryer.  Expected final moisture in the bin is  15.0%

Based on 100% Unload rate of

1360 bph

MOISTURE

MOISTURE

DRYING TABLES — C-2130B

The above drying capacities are estimates based on drying principles, field results, and computer simulations.  Variances may occur
due to the grain’s physiological factors (kernel size, chemical composition, variety, maturity), escessive fines, weather conditions, etc.

Summary of Contents for C-2130B

Page 1: ...RA AT TO OR R S S M MA AN NU UA AL L C 2130B C 2140B C 2160B C 2175B and C 21 100B GRAIN DRYERS Division of ffi Corporation 5900 Elmwood Ave Indianapolis IN 46203 1999 1997 ffi Corporation Printed in...

Page 2: ...s a division of ffi Corporation All rights reserved No part of this publication may be used or reproduced in any form or by any means without prior permission Failure to comply with this notice is a v...

Page 3: ...ive Data 6 SCR Drive Information 6 Blower Drive Data 6 Section 2 TRANSPORTATION INSTALL 7 Transporting Dryer 7 Installation 7 Fuel Connection 7 Fuel Specs 9 Electrical Power Supply 9 Electrical Load O...

Page 4: ...ryer at all times 4 Never attempt to operate the dryer by jumping or otherwise bypassing any safety devices on the unit 5 Always set the main power supply disconnect switch to OFF and lock it in the O...

Page 5: ...t drying using a single plenum chamber with full grain column exposure as required for maximum dry ing capacity Field Conversion Converter pack ages are available to permit conversion from Full Heat t...

Page 6: ...ule with two zones 34 ft 14 in 1010 bu 229 bu 521 bu 260 bu 43 2 8 0 12 10 12 6 8 0 8 10 34 12 6 48 9 11 0 11 0 17 2 1 DIDW 60 HP 12 M Btu Hr 8 10 HP 2800 BPH 8 10 HP 2315 BPH 1 3 HP SCR 205A 230V 103...

Page 7: ...ns Top Auger Capacity Bottom Auger 2 Capacity Meter Roll Drive Electrical Load Dryer Only 3 PH 3 Drying Capacity Shelled Corn 4 Dry Cool 20 15 Dry Cool 25 15 Full Heat 20 15 5 Full Heat 25 15 5 C 2130...

Page 8: ...T A B L E 1 3 A U G E R D R I V E D A T A T A B L E 1 4 S C R D R I V E I N F O R M A T I O N 10 136 177 230 232 259 15 204 266 347 347 388 20 272 354 463 463 517 25 340 443 579 579 646 30 408 531 695...

Page 9: ...gested foundation size The dryer is supplied with a standard leg set to support the dryer body at 24 high Optional 36 and 48 high leg sets are available The dryer must be anchored to the foundation wi...

Page 10: ...DO NOT USE A PRESSURE REGULATOR AT THE SUPPLY TANK OPEN LP SHUT OFF VALVES SLOWLY TO PREVENT ACCIDENTAL CLOSING OF EXCESS FLOW VALVES PROPANE SUPPLY TANK RECOMMENDED MINIMUM OF 1 000 GALLONS CONNECTED...

Page 11: ...ls are not sup plied as a standard part of the dryer control panel A signal contact is provided to control a separate auxil iary load conveyor motor starter dedicated to this func tion A All auxiliary...

Page 12: ...6 Size 1 3 HP DC Control Amps Volts 2 2A 230VAC Motor Amps Volts 1 6A 180VDC T A B L E 2 2 E L E C T R I C A L L O A D O V E R L O A D R E L A Y S a n d C I R C U I T B R E A K E R S 20 10 40 25 C 2 1...

Page 13: ...URNER ENABLED light will remain ON as long as a fire is sensed If the flame is lost the red Burner Lockout Light will come on and the FLAME SAFEGUARD con trol must be manually reset to reignite burner...

Page 14: ...int range is 0 250 F C Push RESET to return to plenum temp display A set point should not be in the display If display is inactive for 60 seconds it automatically returns to a plenum temp display The...

Page 15: ...arrive at the correct meter roll speed Also impor tant DO NOT CHANGE THE MANUAL UNLOAD RATE WHILE IN THE AUTO MODE 5 The Moisture Control unit will begin automatically con trolling the meter roll spee...

Page 16: ...es of the fan heater module can be adjusted to balance the amount of cooling air required Opening the louvers wider will reduce the amount of vacuum cooling and increase the drying airflow rate Closin...

Page 17: ...situ ation the reclaimer damper should be FULLY CLOSED and the fresh air louvers readjusted to give the desired grain cooling required C 2100B1 SERIES FULL HEAT DRYERS FRESH AIR LOUVERS The fresh air...

Page 18: ...ide approximately the same REAR OUTER FLOOR PANEL The rear outer floor panel should be removed from C 2100B1 series dryers only when the HR 2100B1 series reclaimer is used to allow air to flow from th...

Page 19: ...utton The green light on the Control Start button should immediately light indi cating the safety circuit and control circuit are ener gized to allow dryer operation 7 Check conveyor motors rotation A...

Page 20: ...djust the linkage rod length on the butterfly valve to obtain a 1 2 to 1 PSI burner pressure and observe the fire through the hole in the center of the rear access door The fire should appear evenly s...

Page 21: ...tion 50 55 from horizon tal Slowly rotate the box clockwise and the dryer should restart at 15 20 before horizontal Readjust fill switch if required See Fig 4 1 for switch position dia gram Position t...

Page 22: ...20...

Page 23: ...sture content until the dryer has been operated for at least the time required to make one grain pass Time min for one grain pass is as follows For dry cool Grain pass Drying Time x 1 For full heat Gr...

Page 24: ...lation of combustible materials Begin by checking two times per day If no signif icant accumulations are found extend the inspection period to once a day Clean any accumulations from the plenum walls...

Page 25: ...e Time Dry Bph Rate Time Dry Bph Rate Time Dry Bph 18 17 83 25 1125 95 21 1286 19 17 67 30 915 77 26 1046 87 23 1177 20 17 57 35 779 65 31 891 74 28 1002 21 17 50 41 680 57 36 777 64 32 874 22 17 44 4...

Page 26: ...Dry Capacity Unload Dry Capacity Unload Dry Capacity in out Rate Time Dry Bph Rate Time Dry Bph Rate Time Dry Bph 15 13 48 28 647 54 25 740 61 22 832 16 13 36 38 488 41 33 558 46 29 627 17 13 29 46 39...

Page 27: ...87 12 112 214 14 99 241 32 15 10 140 171 11 122 196 12 109 220 33 15 9 152 157 10 133 180 11 118 202 34 15 8 165 145 9 144 166 11 128 187 35 15 8 177 135 9 155 154 10 138 174 CORN full heat 190 F 210...

Page 28: ...F 130 F 140 F Unload Dry Capacity Unload Dry Capacity Unload Dry Capacity in out Rate Time Dry Bph Rate Time Dry Bph Rate Time Dry Bph 15 13 48 28 841 54 25 962 61 22 1082 16 13 36 38 634 41 33 725 46...

Page 29: ...4 12 112 279 14 99 314 32 15 10 140 223 11 122 255 12 109 287 33 15 9 152 205 10 133 235 11 118 264 34 15 8 165 190 9 144 217 11 128 244 35 15 8 177 177 9 155 202 10 138 227 CORN full heat 190 F 210 F...

Page 30: ...130 F 140 F Unload Dry Capacity Unload Dry Capacity Unload Dry Capacity in out Rate Time Dry Bph Rate Time Dry Bph Rate Time Dry Bph 15 13 47 28 1099 54 25 1256 61 22 1413 16 13 36 38 828 41 33 947 4...

Page 31: ...59 13 106 295 14 94 332 32 15 10 132 236 12 116 270 13 103 304 33 15 9 144 217 11 126 248 12 112 279 34 15 9 156 201 10 136 230 11 121 258 35 15 8 167 187 9 146 213 10 130 240 CORN full heat 190 F 210...

Page 32: ...130 F 140 F Unload Dry Capacity Unload Dry Capacity Unload Dry Capacity in out Rate Time Dry Bph Rate Time Dry Bph Rate Time Dry Bph 15 13 47 28 1099 54 25 1256 61 22 1413 16 13 36 38 828 41 33 947 4...

Page 33: ...13 104 335 15 93 377 32 15 10 130 268 12 114 306 13 101 345 33 15 10 142 246 11 124 282 12 110 317 34 15 9 153 228 10 134 260 11 119 293 35 15 8 165 212 9 144 242 11 128 272 CORN full heat 190 F 210...

Page 34: ...130 F 140 F Unload Dry Capacity Unload Dry Capacity Unload Dry Capacity in out Rate Time Dry Bph Rate Time Dry Bph Rate Time Dry Bph 15 13 48 28 1228 54 25 1404 61 22 1579 16 13 36 38 926 41 33 1058 4...

Page 35: ...LEVER VALVE MAIN SAFETY SHUTOFF VALVE BURNER MODULATOR ASSEMBLY PRESSURE GAGE WATER TRAP BUTTERFLY VALVE FUEL INLET PRESSURE GAGE TO BURNER 2ND MAIN SAFETY SHUTOFF VALVE NAT GAS ONLY Fig 6 1 C 2100B o...

Page 36: ...34 Fig 6 3 LP vaporizer assembly Fig 6 4 ASC control panel...

Page 37: ...ROLL MONITOR CONDUIT CONNECTS TO BURNER JUNCTION BOX RH SIDE LH SIDE AS SEEN UNCOUPLED TO FAN HEATER MODULE LH GRAIN HI LIMIT SENSOR PLENUM HI LIMIT SENSOR FAN PRESSURE SWITCH TUBE INSIDE SAME CONDUIT...

Page 38: ...WITCH ASSY IGNITION TRANSFORMER IGNITION WIRE FLAME SENSOR WIRE TERM 35 GROUND WIRE GREEN PLENUM HI LIMIT SENSOR TERM 15 8A 300 DEG F RTD PLENUM SENSOR TERM 85 86 RTD GRAIN SENSOR TERM 75 76 TERMINAL...

Page 39: ...everal hours of operation during initial start up Check periodically thereafter Meter roll crossover chain Adjust to provide 1 4 inch total deflection Drive chain Adjust to provide 1 2 inch total defl...

Page 40: ...6 11 SCR meter roll drive SCR drive motor Gearbox drive cover Motor mount adjustment bolt Gearbox Motor mounting bolts Retighten securely after adjusting belt Drive belt Retension belt drive after fir...

Page 41: ...th a gear box that is initially filled with synthetic oil See Section 7 Service for relube recommendations 40 drive chain Adjust to provide 1 4 to 1 2 inch total deflection Oil level plug hidden Maint...

Page 42: ...grain regulators and meter rolls Important Keep inside of dryer clean Do not allow chaff and other cobustible material to accumulate within air plenum cham ber Make certain to turn off and lock out th...

Page 43: ...so be formed if the dryer is allowed to set partially full For example if the left over grain were to get rained or snowed on TO DUMP THE METER ROLL PAN 1 Pull the hitch pin that locks the pan in the...

Page 44: ...grease fittings to allow the fan motor bearing to be relubricated without disassembly Lubricate the fan motor bearings once each year at the beginning of the drying season by applying 1 2 fl oz appro...

Page 45: ...emperatures may be caused by fuel vaporizing before reaching the vaporizer Check for A Improper fuel hookup Should be drawing liquid from tank B Frosted lines fittings or valves Frost indicates a rest...

Page 46: ...erate lower burner for several minutes with a couple of the meter roll access doors left open to thaw grain then reattempt to operate meter rolls TO LOCATE THE JAM To determine which meter roll is jam...

Page 47: ...o obtain 18V DC across the DC motor armature terminals A1 and A2 3 Recheck Max pot setting step 1 and readjust if nec essary Repeat step 2 and readjust Min pot if neces sary Rechecking the Max and Min...

Page 48: ...20V part wind start for C 2175B C 21100 models 48 Fig 8 3 Power circuit 440V 3 phase for all C 2100B models 49 Fig 8 4 Control circuit all models except part wind start versions 50 52 Fig 8 5 Control...

Page 49: ...Fig 8 1 Power circuit 220V 3 PH for C 2130B C 2140B C 2160B only 47 4B0280A TIF...

Page 50: ...48 Fig 8 2 Power cirucit 220V Part wind start for C 2175B C 21100 models only 4B0280C TIF...

Page 51: ...49 Fig 8 3 Power circuit 440V 3 PH for all C 2100B models 4B0280B TIF...

Page 52: ...Fig 8 4 Control circuit all models except part wind start p 1 of 3 50 4B0280D TIF...

Page 53: ...Fig 8 4 Control circuit all models except part wind start p 2 of 3 51 4B0280E TIF...

Page 54: ...circuit all models except part wind start p 3 of 3 52 NOTES 1 NO FIELD CONNECTIONS 63 64 ARE USED IN NEW METER ROLL SYSTEM 2 REMOVE SHIPPING JUMPER AND INSTALL AUXILIARY CONTACTS FROM TAKE AWAY EQUIPM...

Page 55: ...Fig 8 5 Control circuit part wind start models only p 1 of 3 53 4B0280H TIF...

Page 56: ...Fig 8 5 Control circuit part wind start models only p 2 of 3 54 4B0280I TIF...

Page 57: ...ol circuit part wind start models only p 3 of 3 55 NOTES 1 NO FIELD CONNECTIONS 63 64 ARE USED IN NEW METER ROLL SYSTEM 2 REMOVE SHIPPING JUMPER AND INSTALL AUXILIARY CONTACTS FROM TAKE AWAY EQUIPMENT...

Page 58: ...Fig 8 6 Safety circuit portion of control circuit all models 56 4B0280G TIF...

Page 59: ...ve STOP or START switch Also check switch wiring connections 5 1CR RELAY Check for a defective 1CR relay relay base or faulty wiring Control Circuit Not Energized Shutdown Indicator Light ON SHUTDOWN...

Page 60: ...nored in this situation If the Unload Auger switch is OFF the dryer control cir cuit will not be shut down due to a burner lockout The Flame Safeguard control must be manually reset before re ignition...

Page 61: ...load side of contactor 4 Burner control locked out Check for Burner Lockout light Push burner control reset button on the Flame Safeguard Control in the ASC box 5 If power was present in previous step...

Page 62: ...re does not stabilize Check that valve linkage works freely Check that linkage has been adjusted properly see start up and testing section Check for proper pressure regulator adjustment See fuel speci...

Page 63: ...same rate as was used in manual control when first switch to AUTO If not suspect problems with the Auto Range Module Be patient grain drying is a slow process 1 3 hours for a grain pass is not uncomm...

Page 64: ...bin moisture Usually 1 3 points of moisture are removed from the hot grain when aerated This means if 15 grain moisture is ultimately required in storage the target value from the dryer should be 16 1...

Page 65: ......

Page 66: ...2 17 00 Division of ffi Corporation 5900 Elmwood Ave Indianapolis IN 46203 1999 1997 ffi Corporation Printed in USA...

Reviews: