19
1/ Connect the black wire of the wall control to the motor phase.
2/ Connect the red wire of the wall control to the main phase.
Make sure that no wires protrudes and that the wall control knob is in position 0 (OFF) then reassemble your
wall control (put back the knob and the plate).
WARNING : Before proceeding to the electrical connections, carefully read the safety instructions in
this manual. Before any electrical connections, switch off all power and restart only when the instal-
lation is completed. Electrical connections must be made in accordance with current regulations and
by a qualified electrician.
12W LED light kit sold as an option : Ref CANLIGHT. If you want to install the light kit, please follow the steps
below :
1/ Remove the cover under the ceiling fan by removing the 3 screws / washers and the central part.
2/ Remove the nut / washer from the light kit. Pass the 3 wires and connectors through the central hole of the
cover and screw the cover correctly onto the threaded rod. Put back the washer / nut to secure the assembly.
13. INSTALL THE LIGHT KIT (OPTIONAL)
Summary of Contents for CANOUAN
Page 24: ...www fanelite com fanelitebrand...