background image

TM

AIR

STAR

Summary of Contents for AirStar

Page 1: ...TM AIRSTAR...

Page 2: ......

Page 3: ...Safety 2 Package Contents 3 Tools Needed 4 Fan Clearance Placement 5 I beam Mounting 6 Glulam Mounting 7 Spanning Mount Mount Assembly 8 Extention Assembly 9 Blades Blade Retainers 10 Blade Retainer...

Page 4: ...pliance with all international and national electrical code requirements with respect to grounding of all equipment Many of the part of this unit operat at line voltage DO NOT TOUCH Install all covers...

Page 5: ...Package Contents Power Unit Image of Hardware and Mount Remote pg 2...

Page 6: ...ractchet deep and short wall 2 3 8 allen key 3 Magnetic level 4 Phillips and Flat Head Screw driver 5 Network crimping tool if standard connection will not work 6 Torque Wrench Not Shown Tools Require...

Page 7: ...as placement of lights sprinklers systems HVAV systems and so on In addition OSHA requirements state that fan blade must be a minimum of 10 feet 3 05 Meters above the floor Contact our sales departmen...

Page 8: ...beams use MacroAir I beam Kit PN 60 50106 00 To properlly install mount be sure to use hang mount along slope of the roof For ease of installation the Unistrut for our I beam mount can be installed i...

Page 9: ...es unistrut in conjunction with our Glulam bracket for installations containing glulam beams Installation on Glulam beams will use MacroAir Glulam Mounting Kit PN 60 50108 00 Installing the mount alon...

Page 10: ...sely install the mount hardware prior to installing fan Once the fan is installed and level tighten mount hardware down Spanning Mount also utilizes Unistrut for spanning mount installations Power Uni...

Page 11: ...Extension Assembly Exploded View When Extension is needed assemble between mount and power unit with provided hardware refer to chart on pg 4 for size recomendations pg 8...

Page 12: ...installing blades be sure to install the blade reatainer links by over lapping the reatainers Refer to image above for exploded view Blade bolts must be torqued to 23 ft lbs Blade Retainer Installatio...

Page 13: ...Blade Assembly Image This image represents the correct installation of the Blade and Blade reatainer links pg 10...

Page 14: ...ion In the case where a long CAT5 cable is required please follow the Cat5 B standard The Image above show how to route cables through extension The Image above shows the cable from the top of the Fan...

Page 15: ...MacroAir 794 South Allen Street San Bernardino Ca 92408 p 909 890 2270...

Reviews: