ELECTRICAL WIRING AND LAYOUT OF THE ACCESSORIES
Before installing Nupi 66 arrange for the accessories to have control of the system and meet safety standards as required.
1 - Flasher (included in the kit)
2 - Controller with plug-in receiver (included in the kit)
3 - 230 V - 50 Hz - 0,03 A magneto-thermal circuit breaker
(not included) - (beyond 100 m, cable section 2,5 mm²)
4 - Photocell receiver (for the only one pair included in the kit)
5 - Nupi 66
6 - Photocell transmitter (for the only one pair included in the kit)
7 - Keyswitch (included in the kit)
8 - Mounting posts for photocells
9 - Gate stop in open position (mandatory, not included)
10 - Gate stop in closed position (mandatory, not included)
11 - Gate electric lock for gate leaves wider than 2 meters (not in the kit)
12 - Transmitter (included in the kit)
2
3
4
5
6
6
8
8
5
9
9
4
7
10
12
11
Pic. 2
Pic. 3
The electric cable is
to dangle without
sharp bending all
along gate travel on
opening and closing
cycles.
!
Merely indicative general layout : it is the installler’s responsibility to lay the tubes for the electrical connections most properly.
12
IMPORTANT: gate stops in open and closed gate positions are
fundamental for the correct functioning of the system with
Nupi 66.
!
KIT with oil-hydraulic operators for swinging gates
up to 2,5 m per gate leaf
FIRST OPERATIONS TO MOVE THE PISTON SHAFT OUTWARDS
It is possible to move the piston shaft out either by hand as indicated (see Pic. 3) or electrically by supplying the operator with
power. Either pull or drive the shaft halfway approximately.
NUPI 66
230 V - 50 Hz ± 10%
2
1
See steps for
manual release (Pic. 7)
1