4
INSTALLATION OF THE ANCHORING PLATE INTO THE GROUND
The first operation to be carried out is the cementing of the anchor plate into the ground on a levelled surface obtained through
the pouring of a cement slab, paying attention that the longer side corresponds to the cabinet door side. It is necessary then to
arrange one or two flex conduit tubes with a 50 mm diameter, which will enable the later passage of the electrical service cables
(electrical powering of the system and for the command and safety accessories), as illustrated in Pic. 3.
INSTALLATION OF THE ANCHORING PLATES FOR TWO BARRIERS
For installations that require two Bayt 980 roadway barriers it is necessary to arrange an underground electrical conduit
between the two housing cabinets, for the connection of the photocells or other accessories and for the service cabling (Pic. 4).
English
Right - RH
Left - LH
~ 500 mm
354 mm
~ 500 mm
304 mm
BAYT 980
Pic. 3
Pic. 4
~ 600 mm
65 mm
5 mm
Roadway pavement
Ø 50
Ø 50
Ø 50
Ø 50
Four M14 anchor bolts
!
Important:
screw the anchor bolts into the anchor plate before cementing it in its site, so that the
respective threads protrude completely.
Important:
the anchor plate must be perfectly levelled before it is cemented. Use a level in both directions
to achieve alignment. Furthermore, it must be set
5 mm higher
than the level of the roadway pavement
(Pic. 3).