Pic. 7
Aproli 280 Batt
installed on the
left
Aproli 280 Batt
installed on the
right
E
n
g
li
sh
7
SETTING TO GATE OPERATION - APROLI 280 BATT INSTALLED ON TO THE RIGHT AND LEFT
Once satisfied that voltage is properly supplied to the motors, operator setting is to be attended. Aproli 280 Batt installed on the
left is factory pre-set, gate in closed position. Whereas with Aproli 280 Batt installed on the right, it is required that the motor shaft
be turned to the end of the permitted rotation.
As next step with both operators, the motor shafts are to be rotated a few degrees in the open direction allowing for the arms to
be fixed.
FIXING THE BACK BRACKET TO THE GATE POST
The back bracket is to be fixed to the gate post by means of suitable expanding bolts using 4 of the 8 holes provided in it.
M8 expanding bolts
to suit gate post
material or
brickwork
Pic. 8
250
150
212
120
355
400
Gate view from inside
External oil-hydraulic operator with articulated arm
for swinging gates mounted on large pillars
APROLI 280 Batt
Pic. 9
Power supply
terminals
Should the shaft turn in the wrong direction,
swap power supply to the other phase terminal
230 V - 50 Hz
blue
c
ommon
phase
230 V - 50 Hz
blue
c
ommon
phase