background image

2

External oil-hydraulic operator with articulated arm 

for swinging gates mounted on large pillars

APROLI 280 Batt

E

n

g

li

sh

GENERAL WARNINGS FOR PEOPLE SAFETY

INTRODUCTION 

This operator is designed for a specific scope of applications as 
indicated in this manual, including safety, control and signaling 
accessories  as  minimum  required  with 

FADINI

  equipment. 

 

Any  applications  not  explicitly  included  in  this  manual  may 
cause  operation  problems  or  damages  to  properties  and 
people. 

  Meccanica  Fadini  snc  is  not  liable  for  damages 

caused  by  the  incorrect  use  of  the  equipment,  or  for 
applications not included in this manual or for malfunctioning 
resulting  from  the  use  of  materials  or  accessories  not 
recommended  by  the  manufacturer. 

  The  manufacturer 

reserves  the  right  to  make  changes  to  its  products  without 
prior notice. 

 All that is not explicitly indicated in this manual

is to be considered not allowed.

BEFORE INSTALLATION

Before commencing operator installation assess the suitability 
of the access, its general condition and the structure. 

 Make 

sure  that  there  is  no  risk  of  impact,  crushing,  shearing, 
conveying,  cutting,  entangling  and  lifting  situations,  which 
may prejudice people safety. 

 Do not install near any source of 

heat and avoid contacts with flammable substances. 

 Keep all 

the  accessories  able  to  turn  on  the  operator  (transmitters, 
proximity  readers,  key-switches,  etc)  out  of  the  reach  of  the 
children. 

  Transit  through  the  access  only  with  stationary 

operator. 

 Do not allow children and/or people to stand in the 

proximity  of  a  working  operator. 

  To  ensure  safety  in  the 

whole  movement  area  of  a  gate  it  is  advisable  to  install 
photocells,  sensitive  edges,  magnetic  loops  and  detectors. 

 

Use yellow-black strips or proper signals to identify dangerous 
spots. 

  Before  cleaning  and  maintenance  operations, 

disconnect the appliance from the mains by switching off the 
master  switch. 

  If  removing  the  actuator,  do  not  cut  the 

electric  wires,  but  disconnect  them  from  the  terminal  box  by
loosening the screws inside the junction box.

INSTALLATION

All  installation  operations  must  be  performed  by  a  qualified 
technician,  in  observance  of  the  Machinery  Directive 
2006/42/CE  and  safety  regulations  EN  12453  -  EN  12445. 

Verify  the  presence  of  a  thermal-magnetic  circuit  breaker
0,03  A  -  230  V  -  50  Hz  upstream  the  installation. 

  Use 

appropriate  objects  to  test  the  correct  functionality  of  the 
safety  accessories,  such  as  photocells,  sensitive  edges,  etc. 

 

Carry out a risk analysis by means of appropriate instruments 
measuring the crushing and impact force of the main opening 
and closing edge in compliance with EN 12445. 

 Identify the 

appropriate  solution  necessary  to  eliminate  and  reduce  such
risks. 

 In case where the gate to automate is equipped with a 

pedestrian entrance, it is appropriate to prepare the system in 
such a way to prohibit the operation of the engine when the 
pedestrian entrance is used. 

 Apply safety nameplates with CE 

marking  on  the  gate  warning  about  the  presence  of  an 
automated installation. 

 The installer must inform and instruct 

the end user about the proper use of the system by releasing 
him  a  technical  dossier,  including:  layout  and  components  of 
the installation, risk analysis, verification of safety accessories, 
verification  of  impact  forces  and  reporting  of  residual  risks.

INFORMATION FOR END-USERS

The  end-user  is  required  to  read  carefully  and  to  receive 
information concerning only the operation of the installation 
so that he becomes himself responsible for the correct use of it. 

 The end-user shall establish a written maintenance contract 

with  the  installer/maintenance  technician  (on  -call). 

  Any 

maintenance operation must be done by qualified technicians. 

 Keep these instructions carefully.

WARNINGS FOR THE CORRECT OPERATION OF THE 
INSTALLATION

 

For  optimum  performance  of  system  over  time  according  to 
safety  regulations,  it  is  necessary  to  perform  proper 
maintenance  and  monitoring  of  the  entire  installation:  the 
automation,  the  electronic  equipment  and  the  cables 
connected  to  these. 

 The  entire  installation  must  be  carried 

out by qualified technical personnel, filling in the Maintenance 
Manual  indicated  in  the  Safety  Regulation  Book  (to  be 
requested 

or 

downloaded 

from 

the 

site 

www.fadini.net/supporto/downloads). 

 Operator: maintenance inspection at least every 6 months, 

while  for  the  electronic  equipment  and  safety  systems  an 
inspection  at  least  once  every  month  is  required. 

  The 

manufacturer,  Meccanica  Fadini  snc,  is  not  responsible  for 
non-observance  of  good  installation  practice  and  incorrect 
maintenance of the installation.

DISPOSAL OF MATERIALS

Dispose  properly  of  the  packaging  materials  such  as 
cardboard,  nylon,  polystyrene  etc.  through  specializing 
companies (after verification of the regulations in force at the 
place of installation in the field of waste disposal). Disposal of 
electrical  and  electronic  materials:  to  remove  and  dispose 
through specializing companies, as per Directive 2012/19/UE. 
Disposal  of  substances  hazardous  for  the  environment  is
prohibited

.

Meccanica Fadini s.n.c.

Director in charge

CE DECLARATION OF CONFORMITY of the manufacturer:

Meccanica Fadini snc (Via Mantova, 177/A - 37053 Cerea - VR - Italy) declares under own responsibility that:

APROLI 280 Batt

 complies with the 2006/42/CE Machinery Directive, and also that it is sold to be installed in an “automatic 

system”, along with original accessories and components as indicated by the manufacturing company. An automatic gate 
operator is, by law, a “machinery” and therefore the installer must fit the equipment with all of the applicable safety norms. 
The installer is also required to issue the installer’s Declaration of Conformity. The manufacturer is not liable for possible 
incorrect use of the product. The product complies with the following specific norms: analysis of the risks and subsequent 
action  to  cure  them  as  per  EN  12445  and  EN  12453,  Low Voltage  Directive  2014/35/UE,  Electromagnetic  Compatibility 
2014/30/UE. In order to certify the product, the manufacturer declares under own responsibility the compliance with the 
EN 13241-1 PRODUCT NORMS.

Summary of Contents for APROLI 280 BATT

Page 1: ...EN 13241 EN 12453 EN 12445 APROLI 280 Batt External oil hydraulic operator with articulated arm for swinging gates mounted on large pillars 1 12 GB Instructions manual pages the gate opener ...

Page 2: ...ing on the gate warning about the presence of an automated installation The installer must inform and instruct the end user about the proper use of the system by releasing him a technical dossier including layout and components of the installation risk analysis verification of safety accessories verification of impact forces and reporting of residual risks INFORMATION FOR END USERS The end user is...

Page 3: ... it is also possible to have Aproli 280 Batt in the special option with flow regulator This is an incorporated device that can control the speed of the gate in opening and closing movements independently all along the gate travel recommended for those heavy gates whose inertia is significant For Aproli 280 Batt to work as an automatic system it is required that an electronic control box type Elpro...

Page 4: ...op in open position 9 Fit 55 photocell receiver on post mount 10 Gate electric lock 11 Gate stop in closed position 12 Fit 55 photocell transmitter on post mount 13 Chis 37 keyswitch 14 Vix 53 radio transmitter 230 V 50 Hz 10 4x1 5 mm Pic 2 General layout it is the installer s care and responsibility to properly lay the tubes required for the electrical connections English 2 3 4 1 7 8 9 11 10 4 12...

Page 5: ...n the back side towards the gate post and two underneath in this way it can meet any application requirements Pic 4 Pic 3 Pic 4 View from inside Aproli 280 Batt mounted on the right Gate post fixing bracket Arm bracket for on the gate fixing English 5 A Aproli 280 Batt as default version comes factory pre set to be installed on the left gate in closed position For Aproli 280 Batt to be installed o...

Page 6: ...ke in the most critical position when the gate is fully open Pic 5 FIXING DISTANCES Power C 460 520 580 IMPORTANT The longer is distance L from the gate hinge center the greater is the lever action the arm can exert onto the gate This specially applies to heavy gates But it is also to consider that D ie the space taken by the arm when the gate is fully open increases consequently Both factors are ...

Page 7: ...ep with both operators the motor shafts are to be rotated a few degrees in the open direction allowing for the arms to be fixed FIXING THE BACK BRACKET TO THE GATE POST The back bracket is to be fixed to the gate post by means of suitable expanding bolts using 4 of the 8 holes provided in it M8 expanding bolts to suit gate post material or brickwork Pic 8 250 150 212 120 355 400 Gate view from ins...

Page 8: ...ening direction of the gate Fit the arm and fix the retaining pin into the hole Pic 10 Pic 11 IMPORTANT the hole in the flattened surface of the square shaft is a reference point Aproli 280 Batt is factory pre set to be installed on the left If installed on the right the shaft is to be rotated 205 to get it in the correct position IMPORTANT screw M8 pin into the shaft hole to fix the arm 230 V 50 ...

Page 9: ...re a gate stop in open position cannot be fixed on the ground Aproli 280 Batt comes with an accessory open gatestop adjustable to be mounted on to the operator under the gate post fixing back bracket for the operator arm to stop against it Once satisfied it is adjusted to the required distance tighten M14 locknut and fit the cover and fasten it by M8 nut Pic 12 In closed gate position tough a gate...

Page 10: ...that the electric lock be released by the coded key and the gate pushed open by hand With the locking version releasing is by opening the flap in the front cover by the coded key and lowering the inner lever Locking again is by rising the lever and tightening it hard overtightening though is to be avoided Pic 16 ORDINARY MAINTENANCE Tighten hard External oil hydraulic operator with articulated arm...

Page 11: ...llard Road barrier Operator model Dimensions per gate leaf Weight per gate leaf Installation date Quantity of models installed Maintainer Date NOTE WELL this document must record any ordinary and extraordinary services including installation maintenance repairs and replacements to be made only by using Fadini original spare parts This document for the data included in it must be made available to ...

Page 12: ...tem 708L Shaft rotation angle 205 Weight with arm 11 kg Protection standard IP 67 40 C with specific optional accessories Ref General Catalogue ELECTRIC MOTOR Power output 0 18 kW 0 25 CV Supply voltage 230 Vac Frequency 50 Hz Absorbed power 250 W Absorbed current 1 2 A Motor rotation speed 1 350 rpm Capacitor 12 5 µF Intermittent service S3 APPLICATIONS Max gate weight per leaf 400 kg Max gate wi...

Reviews: