20
Fig. 4
EN
4
.1 - Installation
Place the slicer on a well leveled, smooth,
dry and stable plane ,suitable to support
its weight.
4
.2 - Electric connection
Install the slicer in the immediate vicinity
of an outlet to CE standards derived from
a system that complies with applicable
regulations.
It is the user’s responsibility
to verify
the suitability and proper functioning of
the electrical system (supply line, outlet,
distribution panel, differential thermal
magnetic circuit breaker protection, system
grounding).
Before executing the connection
check that the characterisitcs of the
power supply network correspond to
those indicated on the nameplate of the
slicer.
4
.3 - Control of operation and blade
rotation direction
• Press the button “
I
” (1) to start the
machine and verify whether the
warning light is on (x4).
• Check that the blade (10) rotates in
the direction indicated by the arrow
(counterclockwise looking at the
machine from the blade plate side).
• For slicers with three-phase supply:
if the blade (10) rotates in the
opposite direction,
immediatly stop
the machine
pressing the button
“
0
” (2) and require the intervention
of qualified personnel to reverse
the power cords inside the plug.
INSTALLATION AND PRELIMINARY CHECKS
10
Summary of Contents for F 300 TSV
Page 2: ......
Page 4: ......
Page 46: ...44 39 di 50 Fig 1 Ed 01 2009 BASE...
Page 47: ...45 40 di 50 Fig 2 Ed 01 2009 GUIDES...
Page 48: ...46 Fig 3 Ed 01 2009 41 di 50 BLADE...
Page 49: ...47 Fig 4 Ed 01 2009 42 di 50 PRODUCT GRIP...
Page 50: ...48 Fig 5 Ed 01 2009 43 di 50 BLADE PLATE...
Page 51: ...49 Fig 6 Ed 01 2009 44 di 50 ELECTRICAL PARTS...
Page 52: ...50 Fig 7 Ed 01 2009 45 di 50 SHARPENER...
Page 53: ...51 46 di 50 Fig 8 Ed 01 2009 For vers 300 330 For vers 350 370 PRODUCT TRAY...
Page 60: ...58 PAGE INTENTIONALLY LEFT BLANK...
Page 61: ...2019...
Page 62: ...2019...