background image

 

28

close (or open), then the problem is in the activating 
device. Repair or replace the device.  
 

Problem: The radio controlled opener does not open 
the gate. 
 
Solution:

 

Check the light on the front of the remote transmitter. It 
should illuminate when you signal the gate. If it does not 
illuminate and if the batteries are okay, repair or replace 
the transmitter. 
 
Verify that the wiring for the radio controlled device is 
correct. 
 
Check the wiring for the antenna and correct it if 
necessary. 
 
Check DL1 and DL2. One should illuminate when the 
transmitter button is pressed. 
 
Determine if the fault is in the receiver by temporarily 
connecting a push button device across the appropriate 
terminals. If such a push button device opens the gate, 
repair or replace the receiver. 

 
Problem: The gate doesn't open (or close) though the 
motors are running. 
 
Solution:

 

Make sure that the motor is running in the right 
direction, and make sure the Manual Release mechanism 
has fully engaged the hydraulic system. 
 
Increase the bypass pressure in small 

1

/

4

 turn increments 

to see if the hydraulic system needs more pressure. 
 

Problem: The gate opens but does not close. 
 
Solution:

 

Make sure you have selected the desired operating 
mode. 
 
Verify that the reversing devices are working properly. 
DL4 or DL5 should illuminate when a reversing device 
is triggered. If either does not illuminate, then one of 

your reversing devices is preventing the gate from 
responding to your signal. Check your reversing 
devices.  
 
If no reversing devices are installed, make sure a circuit 
is installed between appropriate terminals. 
 
If the motor is running, insure that the bypass valves are 
correctly adjusted. Increase the bypass pressure in small 

1

/

turn increments to see if the hydraulic system needs 

more pressure. 
 

Problem: The gate does not fully open (or close). 
 
Solution:

 

Increase the bypass pressure(s) to see if the hydraulic 
system needs more pressure. 
 
Check the operator's motor run time selection. You 
should set a time that is just longer than the rated speed 
of your model of operator. For example, because the 400 
CBAC has a rated opening time of 17 sec, you should 
select a time that is just longer than the opening time. 
 
Check to see that there are no obstructions in the path of 
the gate or that the hinges are not binding. 
 

Problem: The operator doesn't work smoothly and 
the gate jerks as it opens and closes. 
 
Solution:

 

Check the oil level in the operator. 
 
Make sure the Manual Release mechanism has fully 
engaged the hydraulic operation of the operator. 
 
Bleed the air from the hydraulic system by cycling the 
gate (opening and then closing) 10 times and pausing for 
a couple of minutes between cycles. 
 
Make sure that a flexible gate leaf is not the problem. If 
the gate leaf flexes, then stiffen the gate or use a slower 
operator. 
 
 

Summary of Contents for 750 Standard

Page 1: ...the Drive Unit 12 Connect the Hydraulic Lines 12 Synchronize the Hydraulic System 13 Install the Gate Leaf Shoe 13 Install the Gate Leaf 15 Installing the Control Panel 15 Connect the Main Power Supp...

Page 2: ...ortant that you locate the gate far enough away from the road to eliminate the potential of traffic getting backed up This distance is affected by the size of the gate how often it is used and how fas...

Page 3: ...ipment observe some fundamental rules Do not touch the equipment with damp or humid hands or feet Do not install or operate the equipment with bare feet Do not allow small children or incapable person...

Page 4: ...cluding shaft length width in cm 47 8 153 4 77 8 12 4 40 20 Weight 100 deg swing lb kg 180 deg swing lb kg 18 8 20 9 Oil quantity qt l 0 9 1 Maximum angle of rotation 100 deg swing deg 180 deg swing d...

Page 5: ...ts base plate with 4 leveling bolts installed and with the sleeve fitted over the splined shaft 2 Box halves right angled and lipped pieces of galvanized steel that together form the sides of the box...

Page 6: ...isengaged you can open and close the gate leaf by hand Such manual operation of the gate is necessary during installation and useful during power failures The two bypass valves are located on the fron...

Page 7: ...them after pause time Opens single leaf connected to Motor 1 and closes it after pause time No effect No effect No effect Off Opening Closes both leaves immediately Closes the leaf immediately Stops S...

Page 8: ...1 No effect opening is inhibited No effect opening is inhibited No effect opening is inhibited Off Opening Stops Stops Stops Stops gate closes when reversing device no longer triggered No effect On O...

Page 9: ...50 Operator consists of the following steps Setting the concrete forms Installing the power unit Installing the drive unit Connecting the hydraulic lines Synchronizing the hydraulic system Installing...

Page 10: ...x 18 in 25 4 x 45 7 cm Axis of rotation of gate leaf Gate post Minimum of 2 1 4 in 5 7 cm maximum of 5 1 4 in 13 3 cm One of 4 bolts that anchor plate into cement footing Figure 4 Recommended dimensio...

Page 11: ...and then lift it off the box The vinyl hinges can now be placed in the hinge receptacles on the right hand side Secure the hinges with the screws provided You may surface mount the power unit box to...

Page 12: ...e the necessary holes for the two hydraulic lines that run from the drive unit to the power unit Once you have made your access holes you can weld the box halves to the foundation plate and to one ano...

Page 13: ...ruct a shear pin assembly to accommodate the extra vertical distance The assembly is welded to the bottom of the gate leaf shoe on one end and to the sleeve for the splined shaft of the pinion on the...

Page 14: ...he bottom side of the U shaped section of the shoe as shown in Figure 10 On the bottom of the U shaped shoe section center the sleeve around the pilot hole that marks the axis or rotation Accurately c...

Page 15: ...veling bolts on the base of the drive unit to correct any problems with the gate s travel Installing the Control Panel Locate the control panel in the most convenient position possible considering the...

Page 16: ...anel box C 3 X 18 AWG 3 X 18 AWG 4 Main power switch D 5 X 18 AWG 5 X 18 AWG 5 Circuit breaker E 5 X 18 AWG 5 X 18 AWG 6 Main junction box F 4 X 14 AWG up 3 X 14 AWG up 7 Switch for 750 Operator to 41...

Page 17: ...in block J1 and connect the power wires to the terminals labeled N neutral and L phase Caution The operators are grounded only by the grounded circuit the installer provides Connect One Activating Dev...

Page 18: ...ystem has one operator connect the capacitor and the brown and black or red and black wires from your operator to the terminals 3 and 5 in block J2 for Motor 1 Connect the blue or white wire from the...

Page 19: ...Panel U L Listed Control Panel Enclosure Cord grip or conduit from U L Listed gate operator s see text Ground Legend Red Black White Yellow Green a b J3 Figure 15 Wiring detail a inside the junction b...

Page 20: ...the motor s direction of rotation replace any test circuits you installed between terminals 11 and 13 between 13 and 21 and between 14 and 15 with the proper reversing and stop devices The instructio...

Page 21: ...J3 In addition terminal block J3 requires a fail safe connection for the photocells Connect the photocells to terminals 20 and 21 Activating Devices and Radio Receiver The acti vating devices and radi...

Page 22: ...y when an activating signal is sent for 2 and 1 gate leaves respectively DL3 should be illuminated except when the stop button is pressed DL4 and DL5 should be illuminated except when the reversing de...

Page 23: ...off EP on on off B on on on C off off on Switch 4 Reversing Device Behavior on Closing Refer to the operating logic tables later in these instructions and to the chart below for how to set DIP switch...

Page 24: ...unit through the bleed screw holes see Fig ure 18 You need to bleed the hydraulic system before setting the gate up for normal operation To run the gate leaf through an open close cycle make sure the...

Page 25: ...22 The location of the bleed screws on the drive unit top view WARNING The pressure the gate leaf applies to the obstruction is determined by the bypass valve adjustment It is the installer s respons...

Page 26: ...the extension collar is affected by the overlap of the extension bar and extension U Attach the 750 extension collar to the bottom of the gate leaf with a 7 16 in 1 1 cm bolt Weld together the extens...

Page 27: ...use check every 6 mo Check all reversing devices Every six months you should verify that all installed reversing devices work properly The Control Panel The control panel requires no maintenance Trou...

Page 28: ...a reversing device is triggered If either does not illuminate then one of your reversing devices is preventing the gate from responding to your signal Check your reversing devices If no reversing dev...

Page 29: ...use negligence or accident or has not been operated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more severe than or otherwise exceedi...

Reviews: