FAAC International, Inc.
303 Lexington Avenue
Cheyenne, WY 82007
www.faacusa.com
November, 2003
400 Operator And
455 D Control Panel
Installation Manual
CONTENTS
Important Safety Information
2
Technical Data
4
Unpacking the Operator
5
The 400 Compact Operator General Characteristics
6
Installation Instructions
6
Prepare the Gate
6
Manual Release Mechanism
7
Install the Operator
7
Install the 455 D Control Panel
10
Exploded View, 400 CBC
12
400 Parts List
13
The 455 D Control Panel General Description
14
Installing the 455 D Control Panel
14
Connect the Main Power Supply
14
Connect the Operator to the Control Panel
15
Check the Motor’s Direction of Rotation
15
Connect Other Devices
16
Set Other Operating Controls
18
Programming
20
Learning of Operating Times
22
Learning of Normal Times
22
Learning Times with Gatecoder
22
Automated Systems Test
23
Logic Tables of 455 D Control Panel
24
Maintenance
26
Safety in Gate Design
26
Troubleshooting
27
Limited Warranty
28
T
H E
4 0 0 O
P E R A T O R
A N D
4 5 5 D C
O N T R O L
P
A N E L
:
I
N S T A L L A T I O N
M
A N U A L
T
h
e 45
5 D Control Pane
l
Ins
tal
la
ti
on In
st
ruc
ti
o
ns