Connecting the chassis grounding stud to the ground terminal............................33
Configuring the cluster IP address from the LCD..................................................40
Configuring the cluster IP address using the config utility.....................................42
4
Table of Contents
Summary of Contents for VIPRION 2400
Page 1: ...Platform Guide VIPRION 2400 MAN 0344 05 ...
Page 2: ......
Page 6: ...6 Table of Contents ...
Page 44: ......
Page 58: ...Figure 16 Airflow in the VIPRION 2400 platform 58 Environmental Guidelines ...
Page 68: ......
Page 70: ...70 China RoHS Requirements ...
Page 71: ...71 Platform Guide VIPRION 2400 ...
Page 72: ......
Page 78: ......
Page 82: ......