C-12 CRUSHER
STARTING SEQUENCE
COLD START:-
When starting the machine in temperatures of 0°C or below, run all systems at engine
speed No.1 for 15 minutes to allow hydraulic oil to reach working temperature.
DO NOT
feed material into
machine during this time. When this is done stop all systems, turn engine speed switch to No.2 & restart all
systems.
DO NOT
turn engine speed switch from position 1 to 2 while any systems are running. See page 22
for proper sequence to start systems running -
DO NOT
operate systems contrary to these instructions.
NOTE:-
The
machine
MUST
be level in both longitudinal and traverse planes and set up on firm level
ground before being operated. Failure to comply with this or any other instructions in this manual may cause
damage to the machine and may invalidate any warranty.
i)
Set speed control to No.1 position
ii)
Turn key clockwise to 'on' position. All lights will flash for
several seconds.
iii)
Turn key to 'start' position and hold until engine starts.
iv)
Release key. (Key will return to 'on' position)
v)
Engine is now running at idling speed.
2:- Speed control
1:- OPEN ELECTRICAL CONTROL BOX
1
Emergency Stop
2
Ignition Key (ON/OFF)
3
Warning Lights
4
Engine Speed Control
5
Engine R.P.M Meter
6
Interlock (ON/OFF)
7
Main Conveyor (ON/OFF)
8
Side Conveyor (ON/OFF)
9
Magnet (ON/OFF)
10
Crusher (ON/OFF)
11
Feeder (ON/OFF)
12
Crusher Reverse (ON/OFF)
13
Tracks (ON/OFF)
14
Main Conveyor (UP/DOWN)
14
13
7
8
9
10
11
4
12
1
6
2
3
5
Ignition Key
8